|
<br />12. NAME
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />
<br />Landscape Designer
<br />
<br />14. YEARS EXPERIENCE
<br />a, TOTA~ lb. WITH C3URRENT FIRM
<br />
<br />Emilv Hamilton
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Savino Miller Design Studio
<br />16. EDUCATION (DEGREE AND SPECIALlZA TlON)
<br />
<br />Master of Landscape Architecture, University of
<br />Illinois, 2007
<br />Bachelor of Plant Science, Cornell University,
<br />2002
<br />
<br />North Miami, Florida
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />none
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Member ASLA/FASLA, Certificate of Completion: Green Roof Infrastructure Design +
<br />Installation 201, Green Roofs for Healthy Cities, Natalie Alpert Award, University of
<br />Illinois, 2006.
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Fisher Island Beach Club Fisher Island, FL PROFESSIONAL SERVICES ICONSTRUCTION (If applicable)
<br /> 2009 2009
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />8.
<br /> Master Plan, Schematic Design through Construction Documents for planting and irrigation
<br /> of the Beach Club and Cabana. Incorporation of large trees into a forest~like canopy
<br /> over dining area and integrated into the beach. Critical views to ocean preserved.
<br /> $125,000.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Belle Plaza Condominium Miami Beach, FL PROFESSIONAL SERVICES rONSTRUCTION (If applicable)
<br /> 2008
<br /> (3) BRIEF DESCRIPTION (Brief scope" size, cost" etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />b.
<br /> Master Plan (SMDS) , Schematic through Construction Documents for planting, paving,
<br /> irrigation, site lighting for Condominium redesign. Improvements included a new barbeque
<br /> pit, new custom canopy for pool deck, reconfiguration of parking lot to increase
<br /> permeable surface, fountain restoration, entry plaza improvements. SMDS Prime. $1 Mill.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Belle Isle Park Miami Beach, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> 2008 2008
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />c.
<br /> Master Plan, Schematic through Construction Documents and Administration for planting,
<br /> paving, and irrigation for city park. Includes dog park, oval field with Bridal Veil
<br /> lined walk, and planting plan based on large existing specimen trees and an increase in
<br /> tropical plant diversity for bird habitat and public enjoyment. $450,000
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> LaFayette Plaza North Miami, FL PROFESSIONAL SERVICES ICONSTRUCTION (If applicable)
<br /> 2008 2008
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />d.
<br /> Master Plan, Schematic Design through Construction Documents and Administration for
<br /> planting, paving, irrigation, and site lighting. Two phases included the inner courtyard
<br /> and streetscape for the affordable housing project. Courtyard is lush with bamboo,
<br /> native palms, and fields fo fern and monstera. $200,000
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Lopez Residence Miami Beach, FL PROFESSIONAL SERVICES ICONSTRUCTION (If applicable)
<br /> 2009 2010
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost etc) AND SPECIFIC ROLE l2U Check if project performed with current firm
<br />e.
<br /> Master Plan, Schematic Design through Construction Documents for planting, paving, and
<br /> irrigation. Front Entry Patio acts as a dual extension of the house and built in planter
<br /> while transitioning into the front garden. A linear pattern plays throughout the garden,
<br /> driveway and pathways, translating between different materials and expression. $30,000.
<br />
<br />1 9 . RELEVANT PROJECTS
<br />
<br />STANDARD FORM 330 (6/2004) PAGE 2
<br />
|