Laserfiche WebLink
<br />12. NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br /> <br />Landscape Designer <br /> <br />14. YEARS EXPERIENCE <br />a, TOTA~ lb. WITH C3URRENT FIRM <br /> <br />Emilv Hamilton <br />15. FIRM NAME AND LOCATION (City and State) <br />Savino Miller Design Studio <br />16. EDUCATION (DEGREE AND SPECIALlZA TlON) <br /> <br />Master of Landscape Architecture, University of <br />Illinois, 2007 <br />Bachelor of Plant Science, Cornell University, <br />2002 <br /> <br />North Miami, Florida <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />none <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Member ASLA/FASLA, Certificate of Completion: Green Roof Infrastructure Design + <br />Installation 201, Green Roofs for Healthy Cities, Natalie Alpert Award, University of <br />Illinois, 2006. <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Fisher Island Beach Club Fisher Island, FL PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> 2009 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />8. <br /> Master Plan, Schematic Design through Construction Documents for planting and irrigation <br /> of the Beach Club and Cabana. Incorporation of large trees into a forest~like canopy <br /> over dining area and integrated into the beach. Critical views to ocean preserved. <br /> $125,000. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Belle Plaza Condominium Miami Beach, FL PROFESSIONAL SERVICES rONSTRUCTION (If applicable) <br /> 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope" size, cost" etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />b. <br /> Master Plan (SMDS) , Schematic through Construction Documents for planting, paving, <br /> irrigation, site lighting for Condominium redesign. Improvements included a new barbeque <br /> pit, new custom canopy for pool deck, reconfiguration of parking lot to increase <br /> permeable surface, fountain restoration, entry plaza improvements. SMDS Prime. $1 Mill. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Belle Isle Park Miami Beach, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2008 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />c. <br /> Master Plan, Schematic through Construction Documents and Administration for planting, <br /> paving, and irrigation for city park. Includes dog park, oval field with Bridal Veil <br /> lined walk, and planting plan based on large existing specimen trees and an increase in <br /> tropical plant diversity for bird habitat and public enjoyment. $450,000 <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> LaFayette Plaza North Miami, FL PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> 2008 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />d. <br /> Master Plan, Schematic Design through Construction Documents and Administration for <br /> planting, paving, irrigation, and site lighting. Two phases included the inner courtyard <br /> and streetscape for the affordable housing project. Courtyard is lush with bamboo, <br /> native palms, and fields fo fern and monstera. $200,000 <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Lopez Residence Miami Beach, FL PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> 2009 2010 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost etc) AND SPECIFIC ROLE l2U Check if project performed with current firm <br />e. <br /> Master Plan, Schematic Design through Construction Documents for planting, paving, and <br /> irrigation. Front Entry Patio acts as a dual extension of the house and built in planter <br /> while transitioning into the front garden. A linear pattern plays throughout the garden, <br /> driveway and pathways, translating between different materials and expression. $30,000. <br /> <br />1 9 . RELEVANT PROJECTS <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />