My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Savino & Miller Design Studio
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
Savino & Miller Design Studio
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 9:49:55 AM
Creation date
11/10/2010 9:49:47 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />12. NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br /> <br />Landscape Designer <br /> <br />14. YEARS EXPERIENCE <br />a. TOTA~ lb. WITH COURRENT FIRM <br /> <br />Courtnev Jenninas <br />15. FIRM NAME AND LOCATION (City and State) <br />Savino Miller Design Studio <br />16. EDUCATION (DEGREE AND SPECIALlZA T/ON) <br />Master of Landscape Architecture, Florida <br />International University School of <br />Architecture, 2008 <br />Bachelor of Arts, Anthropology and Art, <br />Metropolitan State College of Denver, 2001 <br /> <br />North Miami, Florida <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards" etc.) <br />LEED AP - Green Building Certificate Institute, 2009 <br /> <br />1 9. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> 125th Street Paving + Streetscape North Miami, PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Study Florida 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost etc.] AND SPECIFIC ROLE ~ Check if project performed with current firm <br />a. <br /> Planning study explores streets cape improvements to increase the vibrance and pedestrian <br /> traffic along the 125th Street commercial strip through paving and possible planting, <br /> lighting, and layout changes Green considerations include streetside raingardens and <br /> ~..L,"'<-'~_~l f'~~ "~hoo,, nooo+- icloo"" .~" <:1 M <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Pinecrest Garden Lighting Master Pinecrest, PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Plan Florida 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost" etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />b. <br /> Plan is to create a variety of night time experiences within the garden through <br /> variations in lighting effects. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Opa Locka Beautification Opa Locka, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Project Florida 2007 <br /> (3) BRIEF DESCRIPTION (Brief scope, size" cost, etc.] AND SPECIFIC ROLE U Check if project performed with current firm <br />c. <br /> Master planning for city-wide beautification projects to include downtown district, <br /> streetscapes, public gardens, community market, as well as low income and public <br /> housing. Develop and present design alternatives at various planning stages. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami Art Museum Miami, Florida PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE U Check if project performed with current firm <br />d. <br /> Landscape design for the new Miami Art Museum. Scope included hanging gardens and <br /> planting design at all levels. Responsible for scaled site study model as it pertained <br /> to native tree relocation and planting design directives. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Fairchild Tropical Botanical Garden Miami, Florida PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> 2005 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.] AND SPECIFIC ROLE U Check if project performed with current firm <br />e. <br /> Redesign existing garden parcel to become a native butterfly garden. Scope included <br /> pathway and planting layout and design. Project was planned in collaboration with the <br /> Miami Blue Chapter of the North American Butterfly Association. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.