My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Silva Architects
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
Silva Architects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 9:58:22 AM
Creation date
11/10/2010 9:58:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST IllUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> <br />FF. EXAMPLE PROJECT KEY NUMBER: 8 <br /> <br />GG. TITLE AND LOCATION (City and State): Holmes Elementary School Replacement, Miami, FL <br /> <br />HH, YEAR COMPLETED - PROFESSIONAL SERVICES: 2006 <br /> <br />II. YEAR COMPLETED - CONSTRUCTION (If applicable): 2007 <br />23a. PROJECT OWNER'S INFORMATION - PROJECT OWNER: Miami-Dade County Public Schools <br />23b. PROJECT OWNER'S INFORMATION - POINT OF CONTACT NAME: Don Bailey <br />23c. PROJECT OWNER'S INFORMATION - POINT OF CONTACT TELEPHONE NUMBER: 305-995-4838 <br /> <br />38. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost): <br /> <br />Silva Architects provided complete AlE services for this project. This project is a 67,000 gsf elementary school facility in <br />Miami, Florida. The project budget was $15 million. <br />This project showcases Silva Architects' handling of a small but complicated project. The project was fast tracked, as the school <br />was a replacement. Students were temporarily moved to another under-enrolled school while the project was constructed. <br />The project consisted of a partial demolition of the existing Holmes Elementary and a complete gutting and remodeling of the <br />existing Cafetorium and a single classroom building. This complicated project opened on time and was well received by the community. <br />This project is another example of an existing shell that was salvaged and new interior work provided, which will benefit the AlE of <br />the a continuing services project. <br /> <br />39. FIRMS FROM SECTION INVOLVED WITH THIS PROJECT <br /> <br />(1) FIRM NAME (2) FIRM LOCATION (Citv and State) (3) ROLE <br />Silva Architects Coral Gables, FL Architect <br /> <br />STANDARD FORM 330 (6/2004) PAGE 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.