Laserfiche WebLink
<br />".~ <br /> <br />Incorporate materials, equipment, finishes etc to the construction documents to comply with LEED requirements, up load required <br />documents as needed by the USGBC and GBCI to obtain LEED certification, <br /> <br />24. Project Experience Cont. <br /> <br />Construction Administration <br />Monitor contractor's LEED submittals and up load required documents as needed by the USGBC and GBCI to obtain LEED <br />certification. <br />Obtain and review required test reports <br />Keep owner informed of work progress, prepare and submit field reports <br />Receive review and respond to Contractor's applications for payment <br />Receive and review contractor's submittals/ shop drawings for compliance with contract documents <br />Review and recommend actions on contractor's change orders <br />Prepare, review and follow up on contractor's punch list <br />Inspect the project to confirm with substantial completion <br />Review the close out submittals for completeness <br />Prepare final field inspection report. <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. 1. FIRM NAME <br />Borges + Associates, P .A. <br /> <br />2. FIRM LOCATION (City and State) <br />Miami, FL <br /> <br />3. ROLE <br />Prime Architects and oversaw <br />En ineerin Consultants <br /> <br />STANDARD FORM 330(6/2004) PAGE 19 <br />