My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BEA Architects
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
BEA Architects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 11:21:21 AM
Creation date
11/10/2010 11:21:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />{Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.; <br />21. TITLE AND LOCATION (City and State) <br /> <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />9 <br /> <br />Parking Garage Muvico Theaters <br />Boca Raton, FL <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> <br />2000 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER <br />Muvico Theaters <br /> <br />b. POINT OF CONTACT NAME <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(954) 564-6550 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />Fast Track Design Build <br /> <br /> <br />BEA designed a two-story, 103,000 sq, ft. garage capable of accommodating 515 vehicles for MUVICO Theaters at their Boca Raton multiplex. The <br />design featured precast and prestressed concrete and was designed to complement the fanciful theme of the complex. Under BEA's coordination, <br />plans were prepared for the design-build, fast-track project in 30 days with construction completed in four months. <br /> <br />Key Personnel: <br />Bruno-Elias Ramos, AlA <br />Gus Berenblum, AlA <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />(1) FIRM NAME <br />a. BEA Architects, Inc. <br /> <br />(2) FIRM LOCATION (City and State) <br />Miami, FL <br /> <br />(3) ROLE <br /> <br />Aesthetic Integration, Precast <br />Design, Fast-Track Design/Build <br /> <br />RFQ #10-04-02 Professional Architectural Services I 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.