My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C3TS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
C3TS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 11:39:50 AM
Creation date
11/10/2010 11:39:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 14. YEARS EXPERIENCE <br />12. NAME 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM <br />Gloria Garcia, PE, LEED AP Mechanical Engineer 22 6 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Corzo Castella Carballo Thompson Salman, P.A. (C3TS) <br /> <br />- Coral Gables, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Science in Mechanical Engineering <br />University of Havana, 1986 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />Florida Registered Professional Engineer 65606 <br />LEED Accredited Professional <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Okeechobee Landfill Maintenance Building PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Okeechobee, Florida 2008 2009 <br />a. (3) BRIEF DESCRIPTION (Brief Scope, size, cost. etc.) AND SPECIFIC ROLE 0' Check if proiect performed with current firm <br /> Senior Mechanical Engineer responsible for all phases of engineering for this heavy equipment maintenance facility. The building was designed for <br /> the integration of a 4-ton crane system. Services also included programming assistance and permitting. The work was completed within a <br /> condensed schedule and within tiQht budQet requirements. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> University Of Miami PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Hurricane Hardening Of Roof Mounted Air Conditioning & Ventilation Equipment 2008 2009 <br /> Coral Gables, Florida <br />b. 0' Check if proiect performed with current firm <br /> (3) BRIEF DESCRIPTION (Brief Scope. size, cost. etc.) AND SPECIFIC ROLE <br /> Senior Mechanical Engineer for services for the surveying of the campus roofs in order to identify, classify, locate on plans, and inventory the existing <br /> pieces of ventilation and air conditioning equipment. This project also provided hurricane force anchoring for all roof mounted air conditioning and <br /> ventilation eauioment at the Rosenstiel Marine Campus. This oroiect resulted from a FEMA arant to avoid equioment loses in future hurricanes. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Wolfe Food Court at Florida International University PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Biscayne Bay Campus, North Miami Beach, Florida 2007 2008 <br />c. <br /> (3) BRIEF DESCRIPTION (Brief Scope, size, cost. etc.) AND SPECIFIC ROLE 0' Check if project performed with current firm <br /> Senior Mechanical Engineer for the design and coordination of four food vendor kiosks and a catering kitchen. Each vendor is self contained and <br /> shares some amenities with the catering kitchen and storage areas. C3TS is providing architectural and engineering services. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> MDCPS Renovations, Maintenance and Repairs at Miami Northwestern Senior PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> High School, Miami, Florida 2007 2008 <br />d. (3) BRIEF DESCRIPTION (Brief Scope, size. cost. etc.) AND SPECIFIC ROLE 0' Check if proiect performed with current firm <br />Senior Mechanical Engineer for this project which entails a $11 million renovation of this 36,000 s.f. school campus by updating key elements for <br /> compliance with life safety & accessibility requirements, and correcting campus-wide deficiencies such as the existing public/student bathroom <br /> facilities, cosmetology lab, and the building envelope. C3TS has been called to undertake this "expanded maintenance project" based on its past <br /> experience in this particular project type for the Miami-Dade County Public School system (MDCPS) and its wealth of in-house resources in <br /> architecture and enQineerinQ. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Claude Pepper Park Youth Community Center & Gymnasium PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> North Miami, Florida 1st Design Summer 2008 <br /> 2nd DesiQn April 2010 N/A <br />e. (3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE 0' Check if project performed with current firm <br /> Senior Mechanical Engineer for the design of this $ 5.5 million multi-purpose youth center which includes classrooms, youth training center, <br /> computer labs, and health center. Services also included parking lot drainage, water main, pump station, and general site development. <br /> Programmed to be the crown jewel of the City of North Miami's Parks & Recreation Department, this facility will occupy a very highly visible location <br /> within the western end of the City. This project is currently in process of Silver LEED certification. Green design and construction methods are being <br /> used throuahout the oark for environmental benefits. <br /> <br />AUTHORIZED FOR LOCAL REPRODUCTION <br /> <br />STANDARD FORM 330 (6/2004) <br />
The URL can be used to link to this page
Your browser does not support the video tag.