My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C3TS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
C3TS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 11:39:50 AM
Creation date
11/10/2010 11:39:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 14. YEARS EXPERIENCE <br />12. NAME 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM <br />Sergio Martinez Project Designer 10 3 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Corzo Castella Carballo Thompson Salman, P.A. (C3TS) - Coral Gables, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />Bachelor of Science in Electrical Engineering, Universidad Central de <br />Santa Clara, Cuba, 1992 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETEO <br /> Claude Pepper Park Youth Community Center & Gymnasium PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> North Miami, Florida 1 st Design Summer 2008 N/A <br /> 2nd Desiqn Anril 2010 <br />a. (3) BRIEF DESCRIPTION (Brief Scope. size. cost. etc.) AND SPECIFIC ROLE o Check if proiect performed with current firm <br /> Electrical Designer for this $5.5 million multi-purpose youth center which includes classrooms, youth training center, computer labs, and health <br /> center. Services also included parking lot drainage, water main, pump station, and general site development. Programmed to be the crown jewel of <br /> the City of North Miami's Parks & Recreation Department, this facility will occupy a very highly visible location within the western end of the City. <br /> This project is currently in process of Silver LEED certification. Green design and construction methods are being used throughout the park for <br /> environmental benefits. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Design & Construction Services for John F. Kennedy Causeway Redevelopment PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> North Bay Village, Florida 2010 (on-going) N/A <br />b. (3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE o Check if proiect performed with current firm <br /> Electrical Designer for this project that involves the design and construction services for the redevelopment of the John F. Kennedy Causeway. The <br /> project will be implemented in several phases. Phase I will be the landscape design and construction of street beautification improvements to the <br /> western end of the Causeway. While this phase is being implemented, a conceptual master plan shall be prepared to address the complete <br /> beautification and redevelooment orooram for Kennedy Causeway which includes the roadway, adiacent business district, and the waterfront. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> MDX Infrastructure Improvements for the Conversion of SR-924 (Gratigny PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Parkway). SR 874 (Don Shula Expressway) and SR-878 (Snapper Creek 2008 2009 <br /> Expresswav) to Open Road Tollino (ORn: Desion Build. Miami, Florida <br />c. <br /> (3) BRIEF DESCRIPTION (Brief Scope. size. cost. etc.) AND SPECIFIC ROLE o Check if proiect performed with current firm <br /> Electrical Designer responsible for the Highway Lighting Design associated with the conversion of the existing Cash I ETC Toll Collection Plazas to <br /> All Electronic Open Road Tolling. These services were provided at four tolling locations along SR-924 including reconstruction I rehabilitation of <br /> approximatelv 1 mile of SR-924; six tollinq locations alonq SR 874 and four tnllinq locations alonq SR-878. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Murray Park Aquatic Center PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> South Miami. Florida 2010 (On-going) N/A <br /> (3) BRIEF DESCRIPTION (Brief Scope, size. cost. etc.) AND SPECIFIC ROLE o Check if proiect oerformed with current firm <br />d. lectrical Designer for the design for this Aquatic Facility to include a teaching and recreational pool. This pool will have practice lanes (up to 8 & <br /> 3ccessible 3'-0" deep basin area approximately 20'x40') but is intended for high school swimming competition use and be 75' x 67' in size and will be <br /> )rovided with exterior retractable bleachers. A support "bathhouse" to include restrooms lockers and showers for both sexes as well as concessions <br /> non-cooking) support and office space appropriate to the adjoining aquatic facilities only. This structure will also incorporate an open air screened <br /> ~nclosure for equipment. The above scope will require the relocation of an existing double full size basketball court which will be located due west of <br /> he current multipurpose facility. A new liohted asnhalt narkinq area with 12 parkinq stalls with 2 accessible spots. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Uleta Community Center PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> North Miami Beach, Florida 2007 2008 <br />e. o Check if proiect performed with current firm <br /> (3) BRIEF DESCRIPTION (Brief Scope, size. cost. etc.) ANO SPECIFIC ROLE <br /> Electrical Designer for the redesign of a five-acre site, the demolition of two existing structures and two new pools to be constructed into three <br /> phases. The project will be complete with a restored gymnasium, children's classes, offices, and pool building with an enclosed glass corridor <br /> connectinq each space. The site will provide the client with an increased income and educational facilitv. <br /> <br />AUTHORIZED FOR LOCAL REPRODUCTION <br /> <br />STANDARD FORM 330 (6/2004) PAGE 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.