Laserfiche WebLink
<br /> 14. YEARS EXPERIENCE <br />12. NAME 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM <br />Jeffrey S. Crews, PE, LEED AP Senior Project Engineer 21 21 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> <br />15. FIRM NAME ANO LOCATION (City and State) <br />Corzo Castella Carballo Thompson Salman, P.A. (C3TS) - Coral Gables, Florida <br /> <br />Bachelor of Science in Civil Engineering, <br />Cum Laude, University of Miami, 1988 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br /> <br />Florida Prof. Engineer License No. 46575; <br />Certified Masonry Inspector No. SMI 74; <br />FICE/FDOT LRFD Seminar Training; <br />LEED Accredited Professional <br /> <br />16. EOUCATION (DEGREE AND SPECIALIZATION) <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training. Awards, etc.) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Pompano State Farmers Market (New Office Building) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Pompano Beach, Florida, 2001 2002 <br />a. (3) BRIEF DESCRIPTION (Brief Scope. size. cost, etc.) AND SPECIFIC ROLE ~ Check if project perfonned with current Finn <br /> Project Structural Engineer for this project to replace the existing wood-frame Market offices which were constructed in 1939. The new 3-story, <br /> 25,000- sq. ft. multi-tenant administrative office building provides office spaces for the Market's brokers and tenants. The building was designed so <br /> that the core can serve the existing building and a future expansion of up to 25,000 sq. ft. The demolition of most of the old building allowed for the <br /> expansion of parkinq for the tractor trailers which serve the market distribution network. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETEO <br /> Norwood Oeffler Water Treatment Plant and Operations Center PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> North Miami Beach, Florida 2004 2008 <br />b. (3) BRIEF DESCRIPTION (Brief Scope. size, cost, etc.) AND SPECIFIC ROLE ~ Check if project perfonned with current Finn <br />Senior Structural Engineer responsible for the design and constructions documents for all the structural related aspects of the project. The project <br /> includes a large scale expansion and improvements to the existing water treatment plant that includes a new two story 14,500 sq. ft. administrative <br /> operations office building, a new 23,000 sq. ft. nanofiltration and reverse osmosis membrane technology building, in addition to support facilities such <br /> as high service pump rooms, motor control electrical rooms, generator rooms, a new 2,500 sq. ft. structure to hold sodium hypoclhorite tanks, <br /> meterinq rooms and storaae. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> North Dade Maintenance Facility (Phases I, II, III) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> FOOT District 6 2004 2005 <br /> (3) BRIEF OESCRIPTION (Brief Scope. size. cost, etc.) AND SPECIFIC ROLE ~ Check if project perfonned with current Finn <br />c. QA/QC for the structural part of the Design/Build of FDOT District 6 North Dade Maintenance Facility. Phase I consisted of a 12,000 sq. ft. office <br /> building which included offices; conference and training rooms; lunch room with a kitchenette and vending machines; locker facilities with showers <br /> and toilets; and computer / radio communication rooms. Phase II included an 18,000 sq. ft. eight-bay vehicle maintenance/warehouse building; <br /> roofing of a 4-station fueling facility; bulk and secure material storage; and site development of the 8.3 acre parcel. For Phase III C3TS provided <br /> contract documents for the design/build project of a 5.000 sq. ft. office which included offices and conference room for the FDOT Construction Dept., <br /> as well as a 600 SQ. ft. weldinq shop and restroom facilitv. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Martin County Emergency Vehicle Maintenance & Storage Facility PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Martin County, Florida 2007 2009 <br />d. (3) BRIEF DESCRIPTION (Brief Scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project perfonned with current Finn <br /> Project Engineer for the development of design criteria for the design/build of the county's vehicle maintenance facility. Incorporating the latest in <br /> servicing technology, including portable hydraulic lifts, overhead cranes, and prefabricated rack storage, this facility will be the definitive state-of-the- <br /> art facility in South Florida. Mr. Crews is responsible for both this first phase 20,000 sq. ft. design criteria package and the 60,000 sq. ft. master <br /> olannina, includina environmental assessment throuah South Florida Water ManaQement District of this facilitv. <br /> <br />AUTHORIZED FOR LOCAL REPRODUCTION <br /> <br />STANDARD FORM 330 (6/2004) <br />