Laserfiche WebLink
<br />r <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />ComD/ete one Section F for each Droiect.) <br />21. TITLE AND LOCATION (City and State) <br />Business District Ponce De Leon & 8th Street Entrance Gateway <br />City of Coral Gables, Florida <br /> <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br /> <br />7 <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> <br />2008 <br /> <br />2008 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER <br />Ci of Coral Gables <br /> <br />b. POINT OF CONTACT <br />Mr. Alberto Del ado <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />305.460.5001 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT <br />Located at the intersection of Ponce De Leon Blvd. and SW 8th Street entrance to the City of Coral Gables <br />Business District, this portal spans the whole width of the Boulevard, without creating a burden on traffic flow <br />and an obstruction to any views along the Blvd. The goal was to be sensitive to the location, the history and the <br />future of the ever expanding business district as weIl as become a focal point at one of the City's most important <br />entrances. The concept here was to not only treat the vehicular traffic in and out of the City... but more <br />importantly... the pedestrians which cross this area every single day as they go to work, to shop and to dine. The <br />book-end and monuments located to the East and West of the Blvd. entrance contain a portal for all pedestrians <br />to pass through, which gives them a sense of entry into something <br />Special and not seen anywhere. From the South, towards each of <br />These monuments are a series of obelisk which guides and leads <br />the pedestrian from one edge ofthe City... into the heard of the <br />Business District. In turn these portals create and frame the street <br />along with a two story clock tower at the median, establishing the <br />focal oint of the design. <br /> <br />Construction <br />Cost: $350,000 <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. RVL Architecture + Design, 2950 SW 27th Avenue, Suite 310 Architect <br /> P.A Miami, Florida 33133 <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />c. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br /> <br />STANDARD FORM 330 (112004) PAGE 3 <br />