Laserfiche WebLink
<br /> <br />I <br /> <br />architecture . engineering <br /> <br />BALTIMORE ORIOLES STADIUM <br />Fort Lauderdale, Florida <br /> <br /> <br />Following Hurricane Wilma, ACAI provid- <br />ed Damage Assessment of the stadium <br />and surrounding facility through field <br />observation and testing. After the <br />Assessment was completed, coordina- <br />tion of required repairs began. ACAI was <br />responsible for the design work, as well <br />as managing the completion of repair <br />work. <br /> <br />The project scope included inspecitons of <br />all complex roof decks for damage and <br />water intrusion. Testing was done on <br />areas in question and repairs made as <br />necessary. <br /> <br />In addition, ACAI was responsible for the <br />initial visual inspections, coordination of <br />testing and design documents for appli- <br />cable permits and construction. Periodic <br />inspections were made to ensure work <br />was implemented correctly. <br /> <br /> <br />~et~(tIf,a.tt"9 <br /> <br />construction management <br /> <br /> <br />~ <br />~ <br />~ <br /> <br />architecture <br /> <br />engineering <br /> <br />roofing consulting <br /> <br />a"d <)''''''<) dac.~ <br />