<br />CINDY W. BALDWIN, CGC, LEED AP BD+C
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />Principal in Charge of Operations
<br />LEED Consultant
<br />
<br />14, YEARS EXPERIENCE
<br />a. TOT~L7 I b, WITH CUR;ENT FIRM
<br />
<br />12. NAME
<br />
<br />15, FIRM NAME AND LOCATION (City and State)
<br />ACAI ASSOCIATES, INC., Fort Lauderdale, Florida
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> NSU AlE CONTINUING SERVICES CONTRACT PROFESSIONAL SERVICE1 CONSTRUCTION (if applicable)
<br /> Various Campus Locations On-qoinq
<br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm
<br />e. As Campus Architect, ACAI is currently providing services for renovation/repair projects, assessment reports, schematic planning,
<br /> and re-roofing projects throughout all of NSU's campuses. Projects include a $44M, 800,000 gsf medical campus complex in
<br /> Davie, Florida; $70M, 214,000 gsf research building in Davie, Florida; $2.1 M, 53,000 gsf interior fitout in Tampa, Florida, and
<br /> schematic planning for 64,800 gsf in West Palm Beach, Florida. Other projects are located at the North Miami Beach, Dania, Fort
<br /> Lauderdale Orlando Tamoa Jacksonville Ft. Mvers and Puerto Rico camnuses.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> NSU ROOF ASSET MANAGEMENT PROGRAM PROFESSIONAL SERVICES-' CONSTRUCTION (if applicable)
<br /> Various Campus Locations On-qoinq
<br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm
<br /> ACAI has been selected to provide Roofing Consultation Services for NOVA Southeastern University at all of its campuses
<br />f. throughout Florida. A major component includes a Roof Asset Management Program (RAMP). ACAI's responsibility is to provide
<br />the University with a program by which they can monitor the condition of all the roofs of owned properties and immediately
<br /> program required repairs. ACAI provides a Roof Abstract which provides a baseline of knowledge on each building roof and
<br /> establishes its conditions at the time of the visit. The RA includes a roof plan sketch, pictures of the building and provides a
<br /> general overview of the deck at a glance identifying the building and naming the roofing installer, the size and type of roof in place
<br /> and the status of the warranty in place. During the preparation of the RA, ACAI conducts the first semiannual inspection and
<br /> prepares a roof conditions report. ACAI then conducts semiannual visits. A report identifying noted concerns is then issued along
<br /> with a recommendation for roofing repair work.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> FlU ROOF ASSET MANAGEMENT PROGRAM PROFESSIONAL SERVICES1 CONSTRUCTION (if applicable)
<br /> Miami, Florida On-qoinq
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm
<br />g. ACAI has been selected to provide Roofing Consultation Services for Florida International University. A major component includes a Roof Asset
<br /> Management Program (RAMP). ACAl's responsibility is to provide the University a program by which they can monitor the condition of all the
<br /> roofs of owned properties. ACAI provides a Roof Abstract which provides a baseline of knowledge on each building roof and establishes its
<br /> conditions at the time of the visit. The RA includes a roof plan sketch, pictures of the building and provides a general overview of the deck at a
<br /> glance identifying the building and naming the roofing installer, the size and type of roof in place and the status of the warranty in place. During
<br /> the preparation of the RA, ACAI conducts the first semiannual inspection and prepares a roof conditions report.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> SFWMD ENVIRONMENTAL LABORATORY PROFESSIONAL SERVICES I CONSTRUCTION (if applicable)
<br /> West Palm Beach, Florida On-aoina
<br />h. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm
<br /> ACAI was commissioned under the prime contractor for Architectural services including Facility Programming, Site Plan Design,
<br /> and Architectural Plans for the South Florida Water Management District Environmental Laboratory project. This project involved
<br /> design and development of a new facility based upon the final site plan selected by the District's Basis of Design Report (BODR),
<br /> oreliminarv plans as well as complvina with the Districts Standards.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> ANSIN PARK COMMUNITY CENTER PROFESSIONAL SERVICES I CONSTRUCTION (if applicable)
<br /> Miramar, Florida 2009 2009
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm
<br />i. ACAI was selected to provide Architectural services in the further development to the City of Miramar's Ansin Park. This new one
<br />story, 9.000 sq. ft. facility is the second phase to Ansin Park. It is Continuity to our previous designed, the Baseball Pavilion, also
<br /> located at this park. Its main function will be to support daily park administration serving as a community center and the adjacent
<br /> 5,000-seat track and field area. It also includes stadium seating screen wall. As a community center, the areas programmed will
<br /> be game, computers, lockers and a large multi-purpose room that can be divided into two spaces. Special features include a
<br /> second floor press area/observation room, clock tower with electronic information board, and main covered porte-cochere at the
<br /> entry. This Mediterranean Architectural style follows the style standards of the City.
<br />
<br />STANDARD FORM 330 (6/2004)