Laserfiche WebLink
<br />- <br /> <br /> <br />RFQ 10-04-02 Professional Architectural Services <br /> <br />12. NAME <br /> <br />Craig Aquart, C.S.I. <br /> <br />14. YEARS EXPERIENCE <br /> <br />Construction <br />Administration <br /> <br />14 <br /> <br />b. WITH CURRENT FIRM <br />3 <br /> <br />a. TOTAL <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />M.C. Harry & Associates, Inc. / Miami, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA TlON) <br />Master of Architecture, 1998 <br />University of Technology, Jamaica <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Registered Architect in Jamaica <br />Registered Construction Specifications Institute <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />AlA Award of Merit, MIA Concourse H, NIAE Paris Prize Competition, Honorable Mention, AlA Ideal Tropical House <br />Competition, 1st Place, Classical America Student Design Competition, 2nd Place, Registered Construction <br />S ecifications Institute <br /> <br />19. RELEVANT PROJECTS <br /> <br />1) TITLE AND LOCATION (City and State) <br />Collins Cultural Center <br />City of Miami Beach <br /> <br />(2) YEAR COMPLETED 201 0 <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Architecture $7 Million <br /> <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Construction Administration for Park Master plan, landscape architecture, streetscape improvements and art <br />integration to the Collins Park Cultural Center. General improvements include restoration, replacements / <br />additions and enhancement <br />(1) TITLE AND LOCATION (Ci/yand State) (2) YEAR COMPLETED 2007 <br />Northeast High School Cafeteria PROFESSIONAL SERVICES CONSTRUCTION (if <br />School Board of Broward County Architecture applicable) . . <br />$10.8 Million <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Construction Administration for Development of a phased replacement master plan for a 1960's vintage high <br />school. Phase 1 build out includes a 38,000 sf new prototype cafeteria building and food court. <br /> <br />1} TITLE AND LOCATION (City and State) <br />AlEPC Miscellaneous Services <br />Miami Dade County Public Schools <br /> <br />(2) YEAR COMPLETED Ongoing <br />PROFESSIONAL SERVICES CONSTRUCTION (if <br />Architecture appIiCa~/e) <br />Projects under $1 <br />million <br /> <br />c. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Architecture: These services include preparation of design and contract documents for projects that <br />encompass additions, remodeling, renovations and repairs and ADA surveys and implementation. <br /> <br />1) TITLE AND LOCATION (City and State) <br />Melreese Golf Training Center <br />City of Miami <br /> <br />(2) YEAR COMPLETED On going <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Architecture $1.5 Million <br /> <br />d. <br /> <br />3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Architecture for a 5,OOOsf large assembly/classroom area, three enclosed bays facing the practice range, <br />two offices, storage area, restrooms and a kitchenette and vending area. It will also have a pre-fabricated canopy <br />over the existing practice range and connecting walkways to the new clubhouse and parking lot <br /> <br />e <br /> <br />1} TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 2009 <br />Capital Improvements Master Plan. PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Cit of Lauderdale Lakes Architecture Study $56,000.00 <br />Project Architect for validation of 5-year Capital Improvements Program. The scope of the work will require the <br />master planning of the "City Hall Campus" which will include the adaptive reuse, renovation and refurbishment <br />and hardening of existing facilities. <br /> <br />. MCHARRYASSDCIAIES <br />