Laserfiche WebLink
<br />12. NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br /> <br />Lourdes Rodriauez, AlA - President <br />15. FIRM NAME AND LOCATION (City and Statal <br />Architeknics, Inc - Miami. FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Architecture / 1983 / Architecture <br /> <br />Principal-in-Charge <br /> <br />14. YEARS EXPERIENCE <br />8. TOTAL lb. WITH CURRENT FIRM <br />30 I 28 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Architect # 1163 / State of Florida <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />American Institute of Architects <br /> <br />UBC Inspector Training (SREF) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and Statal (2) YEAR COMPLETED <br /> state of Florida - Department of Management Services PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Rohde Building - Various Projects (Part of Continuing Contract) Miami. FL 2007 2009 <br /> (31 BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE LxI Check if project performed with current firm <br />a. Scope: The project at the Rohde Building has included the waterproofing of the fourth level pedestrian deck of the <br /> building. In addition, Architeknics, Inc. provided cost estimates, design development, contract documents, bidding, and <br /> construction administration for four tenant improvement projects throughout the building. <br /> Size: Varies Cost: All Projects $1,000,000 & Under Role: Principal <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami-Dade School Board PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Young Men's Preparatory Academy Miami, FL 2006 2008 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE LxI Check if project performed with current firm <br />Scope: The scope of work for this historic restoration project included but was not limited to the removal and replacement <br /> of the windows and HV AC units in the entire facility. In addition, the architect was in charge of replacing paint, ceiling, <br /> and lighting throughout the entire facility as well as the renovation of the cafeteria, auditorium, and supporting spaces. <br /> Size: 21,000 Sq. Ft. Cost: $6,500,000 Role: Principal <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Miami Beach PROFESSIONAL SERVICES \CONSTRUCTION (If applicable) <br /> Normandy Shores Golf Course Miami Beach, FL 2006 2010 <br /> (31 BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ug Check if project performed with current firm <br />c. Scope: This project included the new construction and renovation of all on site amenities and golf facilities. Architecknics, <br /> Inc. was also in charge of designing the new construction of the clubhouse to reflect the original historic design of the <br /> previous clubhouse that was demolished due to structural damage and beyond repair. <br /> Size: 7,000 Sq. Ft. Cost: $1.900,000 Role: Principal <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> State of Florida - Department of Management Services PROFESSIONAL SERVICES \CONSTRUCTION (If applicable) <br /> Third District Court of Appeals - Phase I & II Miami, FL 2005 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE LxI Check if project performed with current firm <br />d. Scope: This multi-phased project involved the re-roofing of both of the buildings on the premises. <br /> Cost: $11 1.000 (Phase I) / $667.700 (Phase II) Role: Principal <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami-Dade County Parks and Recreation PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> South ridge Park Miami. FL 2008 2010 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE LxI Check if project performed with current firm <br />e. Scope: This project involves the design and completion of a new concession building, new parking, and stadium seating <br /> bleachers in a rejuvenated and renovated public park in South Florida. <br /> Cost: $3,000,000 Role: Principal <br /> <br />ST ANDARD FORM 330 (6 2004) PAGE 2 <br />