|
<br />12. NAME
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />
<br />Edward Berounsky, Vice-President
<br />15. FIRM NAME AND LOCATION (City end Stete)
<br />Architeknics, Inc - Miami, FL
<br />16. EDUCATION (DEGREE AND SPEC)ALlZATlON)
<br />Bachelor of Architecture I 1968 I Architecture
<br />
<br />Construction Administration
<br />
<br />14. YEARS EXPERIENCE
<br />8. TOTAL lb. WITH CURRENT FIRM
<br />40 I 31
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND D)SCIPLlNE)
<br />Architect #5433 I State of Florida
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publicetions, Orgenizations, Training, Awards, etc.)
<br />NCARB
<br />UBC Inspector Training (SREF)
<br />USGBC
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> State of Florida - Department of Management Services PROFESSIONAL SERVICES ICONSTRUCTION (If applicable)
<br /> Rohde Building - Various Projects (Part of Continuing Contract) Miami. FL 2007 2009
<br />8. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE LXI Check if project performed with current firm
<br />Scope: The project at the Rohde Building has included the waterproofing of the fourth level pedestrian deck of the
<br /> building. In addition, Architeknics, Inc. provided cost estimates, design development, contract documents, bidding, and
<br /> construction administration for four tenant improvement projects throughout the building.
<br /> Size: Varies Cost: All Projects $1,000,000 & Under Role: Principal
<br /> (1) TITLE AND LOCATION (City and Stare) (21 YEAR COMPLETED
<br /> Miami-Dade School Board PROFESSIONAL SERVICES ICONSTRUCTION (If applicable)
<br /> Young Men's Preparatory Academy Miami. FL 2006 2008
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE l1d Check if project performed with current firm
<br />b. Scope: The scope of work for this historic restoration project included but was not limited to the removal and replacement
<br /> of the windows and HV AC units in the entire facility. In addition, the architect was in charge of replacing paint, ceiling,
<br /> and lighting throughout the entire facility as well as the renovation of the cafeteria, auditorium, and supporting spaces.
<br /> Size: 21.000 Sq. Ft. Cost: $6,500,000 Role: Construction Administration
<br /> (1) TITLE AND LOCATION (City and Stete) (2) YEAR COMPLETED
<br /> Miami Dade College PROFESSIONAL SERVICES lCONSTRUCTION (If applicable)
<br /> AlE Project Consultant Continuing Contract (2001-2004) Miami, FL 2001-2004 Various
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />c. Scope: Provide Basic AlE Services at Various Campus Locations. The projects include but are not limited to: ESL Lab
<br /> Renovation, Nursing Lab Renovation, Building 3000 Exterior Remediation, Feasibility Study for Recreational Facilities,
<br /> Prometeo Theater Renovation, and various other Classroom Renovations.
<br /> Size: Various Cost: Multiple Projects under $1,000,000 (each) Role: Construction Administration
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> PROFESSIONAL SERVICES ,CONSTRUCTION (If applicable)
<br /> Homestead Bayfront Park - Atoll Pool Homestead, FL 2005 2009
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />d. Scope: The complete renovation of an existing public park and natural pool. The New Facilities include Concession Bldg.,
<br /> Life Guard Chairs, Picnic Shelters, and Shower Stations. Also included is to upgrade the infrastructure of the park including
<br /> new pathways, playgrounds and other improvements to supply a safe, dependable environmentally responsible design.
<br /> Size: 3,000 Sq. Ft. (Buildings) Cost: $3,000,000 Role: Project Architect I CIA
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> PROFESSIONAL SERVICES ICONSTRUCTION (If epplicable)
<br /> Plymouth Congregational Church Miami. FL 2008 2010
<br /> (31 BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE l1d Check if project performed with current firm
<br />e. Scope: This project involved the design and completion of a new chapel and multi-use building on the premises.
<br /> Size: 3,000 Sq. Ft. Cost: $750,000 Role: Construction Administration
<br />
<br />ST ANDARD FORM 330 (6 2004) PAGE 2
<br />
|