Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> B. TOTAL lb. WITH CURRENT FIRM <br />Ramon G. Perez-Alonso, Treasurer Project Architect / Quality Assurance 38 31 <br />15. FIRM NAME AND LOCATION (City end Stata) <br />Architeknics, Inc - Miami. FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Bachelor of Architecture / 1976 / Architecture Architect #7195 / State of Florida <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Trainin ,Awards, atc.) <br /> <br />g <br /> <br />NCARB <br />UBC Inspector Training (SREF) <br />USGBC <br /> <br /> (11 TITLE AND LOCATION (City and Stata) (2) YEAR COMPLETED <br /> State of Florida - Department of Management Services PROFESSIONAL SERVICES \CONSTRUCTION (If applicabla) <br /> Rohde Building - Various Projects (Part of Continuing Contract) Miami. FL 2007 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE l.XI Check if project performed with current firm <br />8. Scope: The project at the Rohde Building has included the waterproofing of the fourth level pedestrian deck of the <br /> building. In addition, Architeknics, Inc. provided cost estimates, design development. contract documents, bidding, and <br /> construction administration for four tenant improvement projects throughout the building. <br /> Size: Varies Cost: All Projects $1,000,000 & Under Role: Principal <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami-Dade School Board PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Young Men's Preparatory Academy Miami, FL 2006 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE LxI Check if project performed with current firm <br />b. Scope: The scope of work for this historic restoration project included but was not limited to the removal and replacement <br /> of the windows and HV AC units in the entire facility. In addition, the architect was in charge of replacing paint, ceiling, <br /> and lighting throughout the entire facility as well as the renovation of the cafeteria, auditorium, and supporting spaces. <br /> Size: 21.000 Sq. Ft. Cost: $6,500,000 Role: Quality Assurance / Quality Control <br /> (1) TITLE AND LOCATION (City and State) (21 YEAR COMPLETED <br /> Miami Dade College PROFESSIONAL SERVICES TCONSTRUCTION (If applicable) <br /> Prometeo Theater Renovation Miami, FL 2004 2004 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />c. Scope: This project at Miami Dade College Prometeo Theater involved taking an existing music classroom and <br /> transforming it into a theater that could replace the theater department's ungainly black box theater. <br /> Size: 2,500 Sq. Ft. Cost: $398,000 Role: Quality Assurance / Quality Control <br /> (11 TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami-Dade County Parks and Recreation PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Camp Owaissa Bauer Miami. FL 2005 2005 <br /> (3) BRIEF DESCRIPTION (Brief scope, siza, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />d. <br /> Scope: The performed work at Camp Owaissa Bauer served to revitalize an out-dated cabin-housing campground in <br /> southern Miami-Dade County. <br /> Size: 114 Acres Cost: $1,600,000 Role: Quality Assurance / Quality Control <br /> (11 TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami-Dade County Parks and Recreation PROFESSIONAL SERVICES TCONSTRUCTION (If applicable) <br /> Southridge Park Miami, FL 2008 2010 <br /> (31 BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE lxi Check if project performed with current firm <br />e. Scope: This project involves the design and completion of a new concession building, new parking, and stadium seating <br /> bleachers in a rejuvenated and renovated public park in South Florida. <br /> Cost: $3,000,000 Role: Quality Assurance / Quality Control <br /> <br />19. RELEVANT PROJECTS <br /> <br />ST ANDARD FORM 330 16 2004) PAGE 2 <br />