Laserfiche WebLink
<br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Se.ction E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />James Cohen AlA, LEED AP Principal-in-Charge a. TOTAL I b. WITH CURRENT FIRM <br /> 25 21 <br />15. FIRM NAME AND lOCATION (City and State) <br />SBLMArchitects PC, Miami, FL <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Bachelor of Architecture, SUNY Buffalo Florida, Architecture <br />Bachelor of Arts, Architecture, SUNY Binghamton <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />American Institute of Architects (AlA), Leadership in Energy Efficient Design Accredited Professional (LEED AP), Construction Specifications <br />Institute (CSI), International Council of Shopping Centers (ICSC), New Commercial and Public Buildings Energy Rater <br /> <br /> 19. RELEVANT PROJECTS <br /> (1) TITLE AND lOCATION (City and State) (2) YEAR COMPLETED <br /> Sunny Isles Beach Community School PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> Sunny Isles, FL 2008 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE X ., <br />a. <br /> Mr. Cohen was the Principal-in-Charge for this new 21O,000-square-foot school which accommodates 1,642 K-8th grade students. <br /> The entire project, from design through construction was completed on time in just 26 months. <br /> <br /> (1) TITLE AND lOCATION (City and State) (2) YEAR COMPLETED <br /> Miami Sunset Senior High School, Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> 2009 2009 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X <br /> Mr. Cohen managed the renovation of this two-story 320,000-square-foot high school initially constructed in 1978. As Principal-in- <br /> Charge, Mr. Cohen oversaw exterior envelope improvements, interior ADA upgrades, and general interior construction. This project <br /> totaled $4.5 million to construct, and was completed as part of the Miami-Dade County Public Schools Facilities Work Program. <br /> <br /> (1) TITLE AND lOCATION (City and State) (2) YEAR COMPLETED <br /> ITS Annex Warehouse Facility, Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> Ongoing Ongoing <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE X '0 ," ,. '!'. . <br />c. <br /> Mr. Cohen is managing the renovation and expansion of the 30,000 square-foot ITS Annex warehouse facility, which serves as a <br /> headquarters for MDCPS's information technology department and its central computer equipment storage depot, staff offices and <br /> repair shop. <br /> <br />(1) TITLE AND lOCATION (City and State) <br />Miami-Dade College, Environmental Signage Program <br />Miami, FL <br /> <br />(2) YEAR COMPLETED <br /> <br />d. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE <br />Mr. Cohen is the Principal-in-Charge managing MDC's new signage program, which includes the development of design standards for <br />internal vehicular and pedestrian signage, directional and identification signage, directories, and ADA signage. New protocols are being <br />developed to ensure a consistent, "branded" approach across all of MDC's various campus locations. <br /> <br />PROFESSIONAL SERVICES <br />Ongoing <br />X <br /> <br /> <br /> (1) TITLE AND lOCATION (City and State) (2) YEAR COMPLETED <br /> Miami-Dade County Public Schools - Special Projects Consultant PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Contract, Miami, FL 2009 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X ". ". <br />e. <br /> As Principal-in-Charge, Mr. Cohen managed this program which architectural services for three schools. At Michael Krop Senior High <br /> School, two new freestanding covered shelters feature food serving bays and vending machines. Both shelters total approximately <br /> 5,000-sqaure-feet. At Norwood Elementary and Parkway Elementary, 2,500-square-feet of covered physical educational shelters and <br /> 500-square-feet of covered walkways and storage facilities were designed and constructed for both schools. <br /> <br />f'IITHi)HITD r +, u <br /> <br />Hf:T'F;( iLll 11 "TIC +J <br /> <br />STANDARD FORM 330 '. <br />