<br />12. NAME
<br />Glenn Lurie AlA, LEED AP
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />Project Manager
<br />
<br />14. YEARS EXPERIENCE
<br />a. ~O;AL I b. ~ITH CURRENT FIRM
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />SBLMArchitects PC, Miami, FL
<br />
<br />16. EDUCATION (Degree and Specialization)
<br />Bachelor of Architecture, Rhode Island School of Design
<br />Bachelor of Fine Arts, Rhode Island School of Design
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />American Institute of Architects (AlA), Leadership in Energy Efficient Design Accredited Professional (LEED AP), Occupational Safety and
<br />Environmental Hazards (OSHA) 500, Florida CGC (Unlimited Certified Building Contractor)
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />Florida, Architecture
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br />2008 2008
<br />(3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE X '" T "f' ice'
<br />a.
<br />Mr. Lurie was the Project Manager of this new 21 O,OOO-square-foot, K - 8th grade school, accommodating 1,642 students. Designed
<br />for the Miami-Dade County Public School system, the program of this $36 million school included classrooms, a media center, a
<br />cafeteria/auditorium and administrative areas, as well as music, art, and science laboratories.
<br />
<br />(1) TITLE AND LOCATION (City and State)
<br />Sunny Isles Beach Community School
<br />Sunny Isles, FL
<br />
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Miami-Dade County Public Schools - Special Projects Consultant PROFESSIONAL SERVICES
<br />Contract, Miami, FL 2009
<br />
<br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X
<br />As Project Manager, Mr. Lurie managed this program which architectural services for three schools. At Michael Krop Senior High
<br />School, two new freestanding covered shelters feature food serving bays and vending machines. Both shelters total approximately
<br />5,000-sqaure-feet. At Norwood Elementary and Parkway Elementary, 2,500-square-feet of covered physical educational shelters and
<br />500-square-feet of covered walkways and storage facilities were designed and constructed for both schools.
<br />
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> City of North Miami Beach Utilities Department, Miami Gardens, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> 2007 2007
<br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE 'f" 'r; , ,r, i ',"
<br />c.
<br /> Mr. Lurie served as Project Manager on this major expansion and upgrade to an existing water treatment facility. New work included
<br /> an administrative building, water treatment buildings and tanks, maintenance facilities, and storage areas for materials and records.
<br />
<br />(1) TITLE AND LOCATION (City and State)
<br />24 Hour Fitness
<br />Miami, FL
<br />
<br />(2) YEAR COMPLETED
<br />
<br />PROFESSIONAL SERVICES
<br />2010
<br />
<br />CONSTRUCTION (If Applicable)
<br />2010
<br />
<br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE X
<br />Mr. Lurie has overseen drafting details on several fitness facilities that include amenities such as an NBA-size basketball court, three-
<br />lane lap pool, steam, sauna, spa, aerobics studio, spin room, and children's play area. Facilities are typically 50,000 square feet and
<br />average $3 million in construction costs.
<br />
<br />
<br />(1) TITLE AND LOCATION (City and State)
<br />TransLoad America
<br />Miami, FL
<br />
<br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X
<br />Mr. Lurie is the Project Manager for this waste transfer-by-rail project, which consists of a 30,000-square-foot transfer building
<br />containing a rail spur, separation, and processing area as well as an office building and gatehouse.
<br />
<br />(2) YEAR COMPLETED
<br />
<br />
<br />
<br />)DI J( TICiN
<br />
<br />STANDARD FORM 330
<br />
|