Laserfiche WebLink
<br />12. NAME <br />Glenn Lurie AlA, LEED AP <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br />Project Manager <br /> <br />14. YEARS EXPERIENCE <br />a. ~O;AL I b. ~ITH CURRENT FIRM <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />SBLMArchitects PC, Miami, FL <br /> <br />16. EDUCATION (Degree and Specialization) <br />Bachelor of Architecture, Rhode Island School of Design <br />Bachelor of Fine Arts, Rhode Island School of Design <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />American Institute of Architects (AlA), Leadership in Energy Efficient Design Accredited Professional (LEED AP), Occupational Safety and <br />Environmental Hazards (OSHA) 500, Florida CGC (Unlimited Certified Building Contractor) <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Florida, Architecture <br /> <br />19. RELEVANT PROJECTS <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br />2008 2008 <br />(3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE X '" T "f' ice' <br />a. <br />Mr. Lurie was the Project Manager of this new 21 O,OOO-square-foot, K - 8th grade school, accommodating 1,642 students. Designed <br />for the Miami-Dade County Public School system, the program of this $36 million school included classrooms, a media center, a <br />cafeteria/auditorium and administrative areas, as well as music, art, and science laboratories. <br /> <br />(1) TITLE AND LOCATION (City and State) <br />Sunny Isles Beach Community School <br />Sunny Isles, FL <br /> <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Miami-Dade County Public Schools - Special Projects Consultant PROFESSIONAL SERVICES <br />Contract, Miami, FL 2009 <br /> <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X <br />As Project Manager, Mr. Lurie managed this program which architectural services for three schools. At Michael Krop Senior High <br />School, two new freestanding covered shelters feature food serving bays and vending machines. Both shelters total approximately <br />5,000-sqaure-feet. At Norwood Elementary and Parkway Elementary, 2,500-square-feet of covered physical educational shelters and <br />500-square-feet of covered walkways and storage facilities were designed and constructed for both schools. <br /> <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of North Miami Beach Utilities Department, Miami Gardens, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> 2007 2007 <br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE 'f" 'r; , ,r, i '," <br />c. <br /> Mr. Lurie served as Project Manager on this major expansion and upgrade to an existing water treatment facility. New work included <br /> an administrative building, water treatment buildings and tanks, maintenance facilities, and storage areas for materials and records. <br /> <br />(1) TITLE AND LOCATION (City and State) <br />24 Hour Fitness <br />Miami, FL <br /> <br />(2) YEAR COMPLETED <br /> <br />PROFESSIONAL SERVICES <br />2010 <br /> <br />CONSTRUCTION (If Applicable) <br />2010 <br /> <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE X <br />Mr. Lurie has overseen drafting details on several fitness facilities that include amenities such as an NBA-size basketball court, three- <br />lane lap pool, steam, sauna, spa, aerobics studio, spin room, and children's play area. Facilities are typically 50,000 square feet and <br />average $3 million in construction costs. <br /> <br /> <br />(1) TITLE AND LOCATION (City and State) <br />TransLoad America <br />Miami, FL <br /> <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X <br />Mr. Lurie is the Project Manager for this waste transfer-by-rail project, which consists of a 30,000-square-foot transfer building <br />containing a rail spur, separation, and processing area as well as an office building and gatehouse. <br /> <br />(2) YEAR COMPLETED <br /> <br /> <br /> <br />)DI J( TICiN <br /> <br />STANDARD FORM 330 <br />