My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SBLM
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
SBLM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 4:41:30 PM
Creation date
11/10/2010 4:41:13 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED 20. EXAMPLE PROJECT KEY NUMBER <br /> 3 <br /> TEAM'S QUALIFICATIONS FOR THIS CONTRACT <br /> (Present as manyprojects as requested by the agency, or 10 projects, if not specified. <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br /> Biscayne Gardens Elementary School, Miami, FL <br /> PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Ongoing Ongoing <br /> <br />~ <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER I b. POINT OF CONTACT NAME <br />Miami-Dade County Public Schools Rose Diamond, Chief Facilities Officer <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br /> <br />Ie. POINT OF CONTACT TELEPHONE NUMBER <br />(305) 995-1401 <br /> <br />As part of the Miami-Dade County Public <br />Schools Facilities Work Program, this <br />68,000-square-foot elementary school, <br />originally built in 1955, is undergoing $3 million <br />in architectural, MEP, and civil rehabilitation and <br />upgrades. The scope of work includes HVAC <br />modernization, plumbing upgrades, a new <br />bus drop-off, and interior design and repairs. <br />Principal-in-Charge James Cohen AlA, LEED <br />AP and Project Manager Julio Sanchez LEED <br />AP are leading the project team. This project is <br />currently on hold. <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />(1) FIRM NAME <br />a. SBLM Architects PC <br /> <br />(1) FIRM LOCATION (City and State) <br />Miami, FL <br /> <br /> <br />L C)i:!\L Hi 11R(>UUCTlCiI~ <br /> <br />(1) ROLE <br />Architect <br /> <br />STANDARD FORM 330"!1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.