My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SBLM
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
SBLM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 4:41:30 PM
Creation date
11/10/2010 4:41:13 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED 20. EXAMPLE PROJECT KEY NUMBER <br /> 2 <br /> TEAM'S QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requesteci by the agency, or 19 projects, if not specified. <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />Miami-Dade County Public Schools - Special Projects <br />Consultant Contract, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> 2009 2009 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER lb. POINT OF CONTACT NAME <br />Miami-Dade County Public Schools Mr. Jorge Bonsenor <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br /> <br />Ie. POINT OF CONTACT TELEPHONE NUMBER <br />(305) 995-1401 <br /> <br />Under the terms of this program, SBLM <br />performed full design services and <br />construction administration for three schools. <br />At Michael Krop Senior High School, two new <br />freestanding covered shelters feature food <br />serving bays and vending machines. Both <br />shelters total approximately 5,OOO-sqaure- <br />feet. At Norwood Elementary and Parkway <br />Elementary, 2,500-square-feet of covered <br />physical educational shelters and 500 square <br />feet of covered walkways and storage facilities <br />were designed and constructed for both <br />schools. SBLM's team was led by Principal- <br />in-Charge James Cohen AlA, LEED AP and <br />Project Manager Glenn Lurie AlA, LEED AP. <br /> <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1) FIRM NAME (1) FIRM LOCATION (City and State) (1) ROLE <br />a. SBLM Architects PC Miami, FL Architect <br /> <br />ljr iF L '[ [' F!. +1 l,_ '''!\L ~:-:t-TJr=,r JUUl_TIC.iI\J <br /> <br />STANDARD FORM 330 ..)i 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.