My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SBLM
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
SBLM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 4:41:30 PM
Creation date
11/10/2010 4:41:13 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED 20. EXAMPLE PROJECT KEY NUMBER <br /> 1 <br />TEAM'S QUALIFICATIONS FOR THIS CONTRACT <br />(eresef1tCis many pr()je.cts as requested by the agency, or 10 projects, if not specified. <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />Sunny Isles Beach Community School, Sunny Isles, FL <br /> PROFESSIONAL SERVICES I CONSTRUCTION (It Applicable) <br /> 2008 2008 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER I b. POINT OF CONTACT NAME <br />Miami-Dade County Public Schools Michael Krtausch, Project Manager <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br /> <br /> <br />[ <br /> <br />,- 'r.;o ,-.. II I <br />~ r <br /> I <br /> .; I J <br />~ I <br /> rr I I <br /> fib.. dl <br /> . - <br /> <br />Ie. POINT OF CONTACT TELEPHONE NUMBER <br />(305) 995-4881 <br /> <br />This ground-up 21O,000-square-foot K-8th <br />grade facility is the first public school to be <br />built in the Sunny Isles Beach community. The <br />education wing provides over 1 600 students <br />with 83 classrooms, incorporating a highly <br />diverse program within a compact building <br />envelope. The design employs passive cooling <br />and daylighting strategies to take maximum <br />advantage of the school's site and to provide <br />unparalleled views of the waterfront. <br /> <br />A firm opening date required a very compressed <br />design and construction schedule. In order to <br />meet this 26 month fast-track schedule, SBLM <br />specified tilt up concrete panels as the exterior <br />building envelope. <br /> <br />Addressing the unsuitable soil bearing <br />conditions, SBLM mandated the entire project <br />be constructed on auger case pilings, grade <br />beams, and a structural slab piling to create <br />an adequate support system. To comply with <br />the site's environmentally sensitive storm <br />drainage requirements, the project utilized a <br />unique gravity well injection system for storm <br />water drainage. The design, permitting, <br />contractor selection and construction were all <br />completed on schedule. SBLM's team was <br />led by Principal-in-Charge James Cohen AlA, <br />LEED AP and Project Manager Glenn Lurie <br />AlA, LEED AP. <br /> <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1) FIRM NAME (1) FIRM LOCATION (City and State) (1) ROLE <br />a. SBLM Architects PC Miami, FL Architect <br /> <br />,AI.. H[PHO[)I~_i( TIOhJ <br /> <br />STANDARD FORM 330 <br />
The URL can be used to link to this page
Your browser does not support the video tag.