Laserfiche WebLink
<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Frank Tejidor, P.E. Engineer a. TOTAL I b. WITH CUR;ENT FIRM <br /> 30 <br />15. FIRM NAME AND LOCATION (City and State) <br />Bermello Ajamil & Partners, Inc., Miami, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Master of Science in Civil Engineering, Geotechnical Engineering Professional Engineer, State of Florida - No. 38847 <br />Purdue University, 1984 Professional Engineer, State of North Carolina <br /> Professional Engineer, State of South Carolina <br />Bachelor of Science in Civil Engineering University of Miami, 1979 Professional Engineer, State of Alaska <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training, Awards, etc.) <br />International Society of Soil Mechanics and Foundation Engineering / American Society of Civil Engineers / Deep Foundations Institute / <br />National Society of Professional Engineers <br /> 19. RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami-Dade Expressway Authority (MDX) General Engineering Consultants, PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Miami. Florida 2005 <br />a. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Lead Technical Professional (Geotechnical Engineer) - Responsible forthe supervision of the design by the geotechnical contractor. <br /> His responsibilities included the review of all shop drawings, establishments of testing criteria for all load tests, construction <br /> monitoring, and approval of final product. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> West Drive Park PROFESSIONAL SERVICES I CONSTRUCTION (if applicoblel <br /> North Bay Village, Florida In Process <br />b. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with currenf firm <br /> Structural/Marine Engineer responsible for the design of the seawalls and the piers for this '/,-acre waterfront park. Fully utilizing <br /> a relatively small area, the design for the park incorporates a new stage, restrooms, playground, exercise path, picnic shelters <br /> and docks for local boafing and canoeing enthusiasts. B&A developed a full set of construction plans for the new park and will <br /> assist the Village through the bidding and construction phase of the project. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami Circle/Brickell Point Property PROFESSIONAL SERVICES I CONSTRUCTION (if opplicablel <br /> Miami. Florida 2009 2009 <br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Project Manager - Responsible for the marine civil engineering for a new limerock-embedded steel sheet pile seawall. The project <br /> secured an important archeological artifact. The current seawall was in severe disrepair and needed to be replaced/ concealed <br /> by a new seawall that would be self-supporting without tiebacks. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Onyx Seawall Replacement PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Miami. Florida 2005 2005 <br />d. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE o Check if project performed wifh current firm <br /> Marine/ Structural Engineer. The project entailed the dredging of a boating basin adjacent to Biscayne Bay. The basin had <br /> experienced substantial siltation and presented a significant environmental degradation. B&A was tasked with developing a <br /> series of dredging plans which would be sensitive to the existing sea grasses in the basin. Approvals for dredging operations were <br /> coordinated with city, state, and federal authorities. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Public 80at Ramp Engineering PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Monroe County, Florida 2005 Various <br />e. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE o Check if project performed wifh current firm <br /> Project Engineer. Engineering design services for the repair and upgrades to six public boot romp facilities in the Florida Keys. <br /> Mr. Tejidor provided civil and structural engineering services. <br /> <br />STANDARD FORM 330 (6/2004) <br />