Laserfiche WebLink
<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Tony Hernandez, PE Construction Administration/Inspections a.TOTAL I b. WITH CUR9RENT FIRM <br /> 27 <br />15. FIRM NAME AND LOCATION (City and State) <br />Bermello Ajamil & Partners, Inc., Miami, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Bachelor of Science in Civil Engineering, Universidad Catolica Licensed Professional, Engineer, State of Florida, Reg. No. PE <br />Madre Y Maesfra, Santiago, Dominican Republic, 1983 0051394 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> 19. RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> MIA Mover PROFESSIONAL SERVICES I CONSTRUCTION IiI applicable) <br /> Miami, Florida In Progress <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE [!] Check if projecf performed wifh current firm <br /> Senior Project Engineer for the implementation Design, Build, Operate and Maintain (DBOM) of a 1.25 mile elevated dual lane <br /> guideway Automated People Mover (A PM) System connecting the Miami International Airport (MIA) Terminal with a remote <br /> ground transportation facility. Includes the Fixed Facilities and Operating System. The total construction cost is S260 million. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Okeechobee Road Widening and Lejeune Road Flyover Grouping PROFESSIONAL SERVICES I CONSTRUCTION lif applicable) <br /> Miami, Florida 2001 2005 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [2] Check if project performed with current firm <br /> Senior Project Engineer responsible for overseeing the day to day inspections and contractor schedule for the projects, material <br /> Quality Control. and coordination of project documentation for the project. The project grouping included road widening & <br /> reconstruction and construction of a fly-over. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> MIC/MIA Package 2 Collector Distributor Project Grouping PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Miami, Florida 2005 2008 <br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE [2] Check if project performed with current firm <br /> Senior Project Engineer for 6 projects providing the connectivity between the Miami Intermodal Center and the major roadway <br /> arterials. In charge of overseeing the daily inspections, contractor schedule for the projects, material Quality Control and <br /> coordination of critical and complex Maintenance of Traffic (MOT) criterion to assure seamless landside system operations. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami-Dade Expressway Authority (MDX) PROFESSIONAL SERVICES I CONSTRUCTION (if opplicable) <br /> Miami, Florida Various Various <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [2] Check if project performed with current firm <br /> Construction Project Manager responsible for the on-site coordination and administration of contract documents. Coordination <br /> of inspection and project management teams. Assessment of field contlicts inclusive of utility and permit coordination, structural. <br /> drainage, roadway, and pUblic safety issues. Projects varied from reconstruction of toll plazas to bridge improvements. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Reconstruction of Calle Ocho (SW 8th Street) PROFESSIONAL SERVICES I CONSTRUCTION lif applicable) <br /> Miami, Florida 1998 2000 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE DCheck if project performed with current firm <br /> Project Engineer for the construction of roadway drainage system, installation of a new 16" dia. watermain, regular excavation, <br /> clearing and grubbing, landscaping, optional base, type S structural asphalt concrete, pavement markings, roadway lighting, <br /> interconnect and signalization. Responsibilities included contract administration, overseeing construction operations, M.O.T. and <br /> quality control of the project as well as supervision of field inspection staff. <br /> <br />STANDARD FORM 330 (6/2004) <br />