Laserfiche WebLink
<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Jose Morales, P.E. Construction Inspector a. TOTAL I b. WITH CU:RENT FIRM <br /> 10 <br />1 S. FIRM NAME AND LOCATION (City and State) <br />Bermello Ajamil & Partners, Inc., Miami. Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Master of Science in Civil Engineering, Florida International Licensed Professional Engineer, State of Florida (2006) <br />University, Miami. Florida, 2003 Reg. No. 64674 <br />Bachelor of Science - Civil Engineering, Florida International <br />University, Miami, Florida, 2001 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> 19. RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> MIC/MIA Package 2 Collector Distributor Project Grouping PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Miami, Florida 2005 2008 <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Project Administrator for 6 projects providing the connectivity between the Miami Intermodal Center and the major roadways. <br /> Responsible for contract administration documents including RFI, shop drawings log, change order requests, material certifications, <br /> pay item quantities, processing monthly progress estimates payments, updating material testing database through L1MS, <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 874, Miami-Dade Expressway Authority (MDX) PROFESSIONAL SERVICES I CONSTRUCTION (if opplicoble) <br /> Miami. Florida 2005 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Project Engineer. Project consist of the widening, resurtacing, and drainage improvements to over 3 miles of this limited access <br /> expressway; the project entails the new alignment and reconstruction of the Killian Parkway Interchange with steel plate girders <br /> spanning 400 feet over open traffic lanes; it includes coordination and construction over the CSX RR Corridor; includes construction <br /> over the C-1 00 SFWM Canal, including dredging; project includes the construction of over 2 miles of 20' high noise walls including <br /> 620' of clear panel walls (pilot project in Florida). <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> District-Wide Planning Contract PROFESSIONAL SERVICES I CONSTRUCTION (if applicoblel <br /> Miami. Florida 2004 <br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE D Check it project performed with current firm <br /> Performed data collection as part of FOOT's Roadway Characteristics Inventory program and arterial LOS for 19 locations in Miami- <br /> Dade County and generate GIS maps of these locations depicting the travel speed and LOS for each segment. Coordinated RCI <br /> data input in regards to sidewalk and bike lanes district wide and prepare GIS shape files to match the input data. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> District-Wide Minor Design Contract PROFESSIONAL SERVICES I CONSTRUCTION (if applicoble) <br /> Miami. Florida 2003 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm <br /> As Engineer prepared construction plans for the implementation of safety improvements identified through Safety and Operational <br /> Studies to be constructed under an accelerated (pushbutton) contract. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> District-Wide Traffic Ops / Safety Studies PROFESSIONAL SERVICES I CONSTRUCTION (if opplicoble) <br /> Miami. Florida 2005 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE D Check if project performed with current firm <br /> As Project Engineer, provided traffic engineering services to produce safety studies, plans reviews and traffic engineering studies to <br /> support the Hazard Reduction Program. Responsibilities included data collection, preparation of condition/collision/improvement <br /> diagrams, LOS/Capacity analysis, cost estimating, and report preparation. <br /> <br />STANDARD FORM 330 (612004) <br />