Laserfiche WebLink
<br /> <br />Alberto Delgado <br />Campus Support Complex, Room 236 <br />University Park, Miami, FL 33199 <br />305-348-4036 <br />Design Cost: Varies <br />Project Status: On-going <br /> <br />Contract Type: CITY OF MIAMI CONTINUING SERVICES CONTRACT <br />Project Name: <br />DOWNTOWN INFRASTRUCTURE STREET PHASES I AND II <br />Location: <br />Miami, Florida <br />Description: <br />Street improvements (RRR) in the Miami Downtown project. The project covers all the <br />streets at the center of Miami Downtown under jurisdiction of the City of Miami and <br />extends North to South from North 5th to South 4th Street and West to East from 1-95 to <br />Biscayne Boulevard. Project involves milling and resurfacing, sidewalk restoration, ADA <br />ramp reconstruction, new landscape installation, drainage improvements and utility and <br />traffic signal modifications. Project also includes coordination with the Department of <br />Homeland Security, FDOT, M-DCPWD and the City of Miami <br />Client: <br />City of Miami <br />Owner's Representative: <br />David Mendez, PE <br />444 SW 2nd Avenue, 8th Floor, Miami, FL 33130 <br />(305) 416-1240 <br />Design Cost: $169,110 <br />Estimated Construction Cost: $1,447,370 <br />Project Status: February 2005 - January 2007 <br /> <br />Contract Type: CITY OF MIAMI CONTINUING SERVICES CONTRACT <br />Project Name: <br />NE 38TH STREET RESURFACING PROJECT <br />Location: <br />Miami, Florida <br />Description: <br />Reconstruction of 0.22 miles of urban collector roadway between North Miami Avenue <br />and NE 2nd Avenue in downtown Miami. Improvements consisted of milling and <br />resurfacing, widening, drainage and street lighting improvements. The project also <br />included coordination with a light rail system. <br />Client: <br />City of Miami <br />Owner's Representative: <br />Tatiana Acosta, P.E. <br /> <br />Page 2 <br />