Laserfiche WebLink
<br /> <br />444 SW 2nd Avenue, 8th Floor, Miami, FL 33130 <br />(305) 416-1263 <br />Design Cost: $96,291 <br />Estimated Construction Cost: $605,829 <br />Project Status: February 2005 - March 2007 <br /> <br />Contract Type: CITY OF MIAMI CONTINUING SERVICES CONTRACT <br />Project Name: <br />DR. MARTIN LUTHER KING BOULEVARD <br />Location: <br />Miami, Florida <br />Description: <br />The Fast-track production of Resurfacing restoration and rehabilitation (RRR) <br />improvements for the Dr. Martin Luther King, Jr. Boulevard (NW 62nd Street). Dr. Martin <br />Luther King, Jr. Boulevard is a major urban road consisting generally of a four lane <br />divided configuration with left and right turn lanes. The project corridor extends in two <br />sections from NW 3ih Avenue to NW 1 ih Avenue (under Miami-Dade County <br />jurisdiction) and from NW 12th Avenue to 1-95 (under City of Miami), with an <br />approximate length of 2.56 miles and 0.64 miles respectively. The project design <br />involves milling and resurfacing, sidewalk beautification and restoration, ADA ramp <br />reconstruction, landscape restoration, new lighting and reconstruction of several linear <br />parks. The project also includes coordination with FDOT, M-DCPWD and the City of <br />Miami. <br />Client: City of Miami <br />Owner's Representative: <br />Kevin Brown, P.E. <br />444 SW 2nd Avenue, 8th Floor, Miami, FL 33130 <br />(305) 416-1090 <br />Design Cost: $124,294.00 <br />Estimated Construction Cost: $2,591,660 <br />Project Status: February 2005 - May 2007 <br /> <br />Contract Type: CITY OF MIAMI CONTINUING SERVICES CONTRACT <br />Project Name: <br />NE 71 ST STREET STORM SEWERS <br />Location: <br />Miami, Florida <br />Description: <br />Roadway improvements to two miles of urban roads and stormwater management <br />systems to mitigate flooding conditions within 35 acres of urban watershed. <br />Responsible for the design of all open and closed storm sewer systems in accordance <br />with City of Miami, SFWMD, and Miami-Dade DERM criteria as well as project <br />permitting with DERM, FDEP, and USACE, including milling and resurfacing of the <br />project area. The drainage design involves roadside swales, exfiltration facilities, <br /> <br />Page 3 <br />