My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Metric Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
Metric Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2010 4:33:14 PM
Creation date
11/16/2010 4:09:10 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Contract Type: CITY OF CORAL GABLES CONTINUING SERVICES CONTRACT <br />Project Name: <br />MIRACLE MILE STREETSCAPE IMPROVEMENTS <br />Location: <br />Coral Gables, Florida <br />Description: <br />Under a General Engineering Service Contract, <br />Metric provided design and planning services to <br />the City of Coral Gables for drainage <br />improvements, site design, safety studies, <br />intersection analysis, access management and <br />roadway improvements. The Miracle Mile <br />roadway improvement project involved the <br />development of design alternatives to reconfigure <br />travel lanes, on-street parking and sidewalks in <br />order to enhance the downtown business area <br />between LeJuene Road and Douglas Road. Streetscaping and sidewalk improvements <br />were developed to accommodate outdoor cafes while maintaining the character of the <br />Coral Gables downtown. Project activities included preparation of conceptual <br />engineering plans, public information meetings, and stakeholder meetings with the <br />Downtown Business District agents in order to reach consensus for the planned <br />improvements. <br /> <br /> <br />Client: <br />City of Coral Gables <br />Owner's Representative: <br />Alberto Delgado, P.E. <br />Department of Public Works, 2800 SW 72nd Avenue, FL 33155 <br />305-460-5008 <br />Design Cost: $250,000 <br />Project Status: January 2004 - January 2005 <br /> <br />Project Name: <br />GENERAL ENGINEERING SERVICES CONTRACT <br />Location: <br />Palm Beach, Florida <br />Description: <br />Design and plans preparation required for the construction of roadway and drainage <br />improvements. Following the approval of a comprehensive drainage study of two major <br />drainage basins, the Town of Palm proceeded with the design of a new storm water <br />management and conveyance system that required the reconstruction of several miles <br />of roadway within the Town limits. The project required a close coordination with utility <br />owners and property owners. It also required Roadway and drainage design and pump <br />station design with outfalls to the Intracoastal Waterways, which required close <br />coordination with SFWMD. <br /> <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.