|
<br />12. NAME 13.ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br /> Enrique Antelo Project Manager a. TOTAL I b. WITH CURRENT FIRM
<br /> 36 29
<br />15. FI RM NAME AND LOCATION (City and State)
<br /> Metric Engineering, Inc./Miami, FL
<br />16. EDUCATION (DEGREE AND SPECIALlZA nON) 17. CURRENT PROFESSIONAL REGISTRATION (STATE
<br /> BS Engineering Technology AND DISCIPLINE)
<br /> N/A
<br />18.0THER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br /> N/A
<br /> 19. RELEVANT PROJECTS
<br /> (1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
<br /> South Dade Busway - Segment II/Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If
<br /> Applicable)
<br /> 2007
<br />a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm
<br /> Construction of a 7.3 miles of roadway and bike path for Miami-Dade Transit. Responsible for the desi~n of all roadway signalization, pavement
<br /> marking, and drainage systems as well as plans and contract document production and construc Ion administration. The project desi~n
<br /> involvea intersection Improvements, street I~htin~, signalization, maintenance of traffic, and engineered mitigation of in-situ contaminated SOl s
<br /> within significant portions of the project corri or. roject Manager. Metric's Fee: $4,657,807
<br /> (1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
<br /> NE 71s1 Street Storm Sewers/Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If
<br /> Applicable)
<br /> 2007
<br />b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm
<br /> Roadway improvements to two miles of urban roads and storm water management systems to mitigate flooding conditions within 35 acres of
<br /> urban watershed. Responsible for the design of all open and closed storm sewer systems in accordance with City of Miami, SFWMD, and
<br /> Miami-Dade DERM criteria as well as project permitting with DERM, FDEP, and USACE, including milling and resurfacing of the project area.
<br /> Project Manager. Metric's Fee: $194,829.23
<br /> (1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
<br /> Washington Avenue Parking Lot/City of Homestead, FL PROFESSIONAL SERVICES CONSTRUCTION (If
<br /> Applicable)
<br /> 2007
<br />c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm
<br /> Site development project for the City of Homestead Community Redevelopment Agency to create 122 car spaces parking lot
<br /> located in SE corner of Washington Ave. and NE 2nd Street. The Civil design included French drain system, ornamental lighting,
<br /> singing and pavement markings, landscaping and irrigation system.. Project Manager. Metric's Fee: $82,908.00
<br /> (1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
<br /> NW 9th Street Pedestrian Mall-Phases I & II/Miami, FL' PROFESSIONAL SERVICES CONSTRUCTION (If
<br /> 2001 Applicable)
<br />d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm
<br /> Metric was responsible for all Civil Design and ConstruMetric was the Prime Consultant for the Overtown Pedestrian Mall which eliminated
<br /> vehicular traffic on NW 9th Street and established a pedestrian mall in its place. Project Manager. Metric's Fee: $126,522
<br /> (1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
<br /> Force Main Improvements, City of Dania Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If
<br /> Applicable)
<br /> 2007
<br />e (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm
<br /> Construction of 2,300 linear feet of 16" sanitary sewer force main under a joint project agreement between Dania Beach and
<br /> FOOT. The project involved fast-track design to upgrade and relocate existing sanitary systems in advance of planned road
<br /> improvements and to service local redevelopment. The project also involved significant traffic control, permitting, and post-design
<br /> services. Project Manager. Metric's Fee: $16,055
<br />
<br />STANDARD FORM 330 (6/2004)
<br />
|