Laserfiche WebLink
<br />r'--~~PRO~OSE~--~~~ <br />.L (Comp1e.te 9n~)e.9t!on E for each key person.) I <br /> <br />12. NAME <br />Robert Linares, PE <br /> <br />13. ROLE IN THIS CONTRACT <br />Principal-in-Charge <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL I b. WITH CURRENT FIRM <br />12 12 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Metric Engineering, Inc./Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALlZA TlON) <br />BSCE Civil Engineering <br /> <br />17.CURRENT PROFESSIONAL REGISTRATION (STATE <br />AND DISCIPLINE) <br />FUProfessional Engineer <br /> <br />18.0THER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />19. RELEVANT PROJECTS <br /> <br />(1) TITLE AND LOCATION (City and State) <br />SR-710 PD&E Study <br />OkeechobeelMartin Counties, FL <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />Applicable) <br /> <br />2009 <br /> <br />a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm <br /> <br />Project Manager. PD&E Study for a 15-mile stretch of SR71 O( a FIHSISIS facility) in Martin County from the Okechobee/Martin County Line to <br />CR 609 The study will conSider additional thru lanes, special treatment and/or additional lanes at major intersections, and widening of the <br />crossroads up to 1000ft. in each direction where necessary to provide intersection operation at an acceptable LOS. In addition a grade <br />separated Highway/Rail crossing will be evaluated. This project will be developed following the ETDM methodology. Project Cost: $1.3 mimon. <br /> <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />SR.836 PD&E Study PROFESSIONAL SERVICES CONSTRUCTION (If <br />Miami-Dade County, FL Applicable) <br />2009 <br /> <br />b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm <br /> <br />Project Manager for this PD&E project involves the potential realignment, capacity and geometric improvements to State Road 836 (SR-836), <br />an elevated expressway that traverses approximately 1.4 miles within the City of Miami. More specific improvements potentially involve the <br />provision of a minimum of six continuous mainline lanes and the provision of parallel collector distributor facilities. Project Cost: $1.6 million <br /> <br />(1) TITLE AND LOCATION (City and State) <br />1-395 PD&E Study <br />Miami-Dade County, FL <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />Applicable) <br /> <br />2008 <br />c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm <br />Project Manager for this PD&E Study which entails the preparation of an EIS for a proposal to improve Interstate Route 1-395 in <br />Miami-Dade, Florida. The proposed improvement would involve the reconstruction of 1-395 from 1-95/Midtown Interchange to <br />Biscayne Bay, a distance of 1.2 miles. Improvements to the corridor are considered necessary to provide for the existing and <br />projected traffic demand. Project Cost: $1.3 million <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Krome Avenue North PD&E Study PROFESSIONAL SERVICES CONSTRUCTION (If <br />Miami-Dade County, FL 2006 Applicable) <br /> <br />d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Project Manager for this study which investigated the proposed widening of Krome Avenue, one of South Florida's most rural corridors. The <br />project included a detailed safety analysis of the corridor and comprehensive alternative generation and selection process. Furthermore, the <br />study required the preparation of preliminary engineering reports and master plans as well as extensive environmental work and coordination <br />with all the regulatory agencies. Project Cost: $1 million <br /> <br />(1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED <br />th <br />NW 14 Street Access Improvements to 1-395 PD&E Study PROFESSIONAL SERVICES CONSTRUCTION (If <br />Miami-Dade County, FL Applicable) <br />2005 <br />e (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm <br />Project Engineer for this PD&E Study for the addition of on/off ramps to 1-95 and 1-395. Study requires a comprehensive PD&E <br />analysis and IJR. The project includes preliminary and final engineering reports and master plans, traffic modeling and technical <br />memorandum, and extensive public involvement with the Overtown area. Project Cost: $900,000. <br /> <br />STANDARD FORM 330 (6/2004) <br />