Laserfiche WebLink
<br /> ~;I~'1IJI'jl~"@~=l;~~']~I~I=lL,~~ <br /> ~. - - 'JIII_Il' - . -, - . Llf <br />12.NAME 13.ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> Allan Sequeira, PE Project Engineer a. TOTAL I b. ~ITH CURRENT FIRM <br /> 10 <br />15. FIRM NAME AND LOCATION (City and State) <br /> Metric Engineering, Inc. <br />16. EDUCATION (DEGREE AND SPECIALlZA nON) 17. CURRENT PROFESSIONAL REGISTRATION (STATE <br /> BSCE, Florida International University, 1999 AND DISCIPLINE) <br /> Florida PE #60737 (2004) <br />18.0THER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> N/A <br /> 19. RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED <br /> SR-112 Toll Plaza Conversion, Miami-Dade County, Florida PROFESSIONAL SERVICES CONSTRUCTION (If <br /> Applicable) <br /> 2007 2008 <br />a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm <br /> Project consisted of three primary elements: roadway, toll plaza, and employee parking area. Roadway consisted of expanding <br /> the merging and diverging areas, correcting roadway cross slope, drainage, signing & pavement markings, MOT and roadway <br /> lighting. The toll plaza portion consisted of the conversion of two dedicated Sun Pass lanes to express SunPass lanes, the <br /> parking was reconfigured. Contract Value: $1.5M. Project Engineer <br /> (1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED <br /> MIC Rental Car Center Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If <br /> Applicable) <br /> 2007 On-going <br />b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm <br /> Design and development of the Site Civil Construction Plan for the proposed Rental Car Facility This 3.4 million square foot <br /> "rental car shopping mall" will provide customers arriving through MIA convenient access to participating rental car companies. <br /> Contract Value: $1.4M. Project Engineer <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> S.W. 62" Avenue (SW24th Street to NW 7th Street) PROFESSIONAL SERVICES CONSTRUCTION (If <br /> Miami-Dade County, FL Applicable) <br /> 2008 NIA not started <br />c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm <br /> Prepare a Contract Plans Set for the total reconstruction of a 2.0 mi segment of this urban corridor. Including upgrading one <br /> signalized intersections from span-wire to mast-arm, implementation of a traffic safety study, compliance with ADA <br /> requirements, drainage design, signing & pavement markings, maintenance of traffic and the design of a new street lighting <br /> system. Contract Value: $393,290. Designer of Record <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR-997/Krome Avenue from US-1 to Avocado Drive 1 SW296th PROFESSIONAL SERVICES CONSTRUCTION (If <br /> Street, Miami-Dade County, Florida 2009 Applicable) <br /> N/A <br />d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm <br /> Prepare Construction Documents (plans and specifications) for the 3.78 mile segment of this urban corridor, including signing & <br /> pavement markings, upgrading seven signalized intersections from span-wire to mast-arm, a new signalized intersection, 0.5 mi <br /> of lighting, implementation of four traffic safety studies, implementation of Access Management and compliance with ADA <br /> requirements, Landscaping & Irrigation within the City of Homestead Florida. Contract Value: $1.0M. Project Engineer <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Lummus Neighborhood- Streetscape Improvements PROFESSIONAL SERVICES CONSTRUCTION (If <br /> City of Miami Beach, Florida Applicable) <br /> 2007 2009 <br />e (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm <br /> Project consisted of improving the water main and drainage in the Lummus Neighbourhood, for 6th Street, ih Street, 8th Street, <br /> 9th Street, 10th Street, 11th Street, 12th Street, 13th Street, 14th Street, 14th Lane and Espanola Way. Storm water pipe <br /> upsizing and drainage was incorporated to the drainage improvements. Milling & Resurfacing, signing and <br /> pavement marking, street lighting and aesthetic enhancement. Contract Value: $1.5M. Project Engineer <br /> <br />STANDARD FORM 330 (6/2004) PAGE <br />