|
<br /> ~;I~'1IJI'jl~"@~=l;~~']~I~I=lL,~~
<br /> ~. - - 'JIII_Il' - . -, - . Llf
<br />12.NAME 13.ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br /> Allan Sequeira, PE Project Engineer a. TOTAL I b. ~ITH CURRENT FIRM
<br /> 10
<br />15. FIRM NAME AND LOCATION (City and State)
<br /> Metric Engineering, Inc.
<br />16. EDUCATION (DEGREE AND SPECIALlZA nON) 17. CURRENT PROFESSIONAL REGISTRATION (STATE
<br /> BSCE, Florida International University, 1999 AND DISCIPLINE)
<br /> Florida PE #60737 (2004)
<br />18.0THER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br /> N/A
<br /> 19. RELEVANT PROJECTS
<br /> (1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
<br /> SR-112 Toll Plaza Conversion, Miami-Dade County, Florida PROFESSIONAL SERVICES CONSTRUCTION (If
<br /> Applicable)
<br /> 2007 2008
<br />a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm
<br /> Project consisted of three primary elements: roadway, toll plaza, and employee parking area. Roadway consisted of expanding
<br /> the merging and diverging areas, correcting roadway cross slope, drainage, signing & pavement markings, MOT and roadway
<br /> lighting. The toll plaza portion consisted of the conversion of two dedicated Sun Pass lanes to express SunPass lanes, the
<br /> parking was reconfigured. Contract Value: $1.5M. Project Engineer
<br /> (1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
<br /> MIC Rental Car Center Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If
<br /> Applicable)
<br /> 2007 On-going
<br />b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm
<br /> Design and development of the Site Civil Construction Plan for the proposed Rental Car Facility This 3.4 million square foot
<br /> "rental car shopping mall" will provide customers arriving through MIA convenient access to participating rental car companies.
<br /> Contract Value: $1.4M. Project Engineer
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> S.W. 62" Avenue (SW24th Street to NW 7th Street) PROFESSIONAL SERVICES CONSTRUCTION (If
<br /> Miami-Dade County, FL Applicable)
<br /> 2008 NIA not started
<br />c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm
<br /> Prepare a Contract Plans Set for the total reconstruction of a 2.0 mi segment of this urban corridor. Including upgrading one
<br /> signalized intersections from span-wire to mast-arm, implementation of a traffic safety study, compliance with ADA
<br /> requirements, drainage design, signing & pavement markings, maintenance of traffic and the design of a new street lighting
<br /> system. Contract Value: $393,290. Designer of Record
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> SR-997/Krome Avenue from US-1 to Avocado Drive 1 SW296th PROFESSIONAL SERVICES CONSTRUCTION (If
<br /> Street, Miami-Dade County, Florida 2009 Applicable)
<br /> N/A
<br />d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm
<br /> Prepare Construction Documents (plans and specifications) for the 3.78 mile segment of this urban corridor, including signing &
<br /> pavement markings, upgrading seven signalized intersections from span-wire to mast-arm, a new signalized intersection, 0.5 mi
<br /> of lighting, implementation of four traffic safety studies, implementation of Access Management and compliance with ADA
<br /> requirements, Landscaping & Irrigation within the City of Homestead Florida. Contract Value: $1.0M. Project Engineer
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Lummus Neighborhood- Streetscape Improvements PROFESSIONAL SERVICES CONSTRUCTION (If
<br /> City of Miami Beach, Florida Applicable)
<br /> 2007 2009
<br />e (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm
<br /> Project consisted of improving the water main and drainage in the Lummus Neighbourhood, for 6th Street, ih Street, 8th Street,
<br /> 9th Street, 10th Street, 11th Street, 12th Street, 13th Street, 14th Street, 14th Lane and Espanola Way. Storm water pipe
<br /> upsizing and drainage was incorporated to the drainage improvements. Milling & Resurfacing, signing and
<br /> pavement marking, street lighting and aesthetic enhancement. Contract Value: $1.5M. Project Engineer
<br />
<br />STANDARD FORM 330 (6/2004) PAGE
<br />
|