Laserfiche WebLink
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> Raul Driggs, PhD, PE Traffic Engineer a. TOTAL I b. WITH CURRENT FIRM <br /> 43 32 <br />15. FIRM NAME AND LOCATION (City and State) <br /> Metric EnQineering, Inc./Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION (STATE <br /> PhD, Transportation Engineering AND DISCIPLINE) <br /> MS, Civil Engineering FL, PAlProfessional Engineer <br /> BS Civil Engineering <br />18.0THER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> Value Engineering Certification <br /> 19. RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR-710 PD&E Study PROFESSIONAL SERVICES CONSTRUCTION (If <br /> Okeechobee/Martin Counties, FL Applicable) <br /> 2009 <br />a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm <br /> Senior Project En~neer. PD&E Study for a 15-mile stretch of SR71 O(a FIHS/SIS facility) in Martin Countt from the OkechobeelMartin Countx <br /> Line to CR 609 e studt will consider additional thru lanes, special treatment and/or additional lanes a major intersections, and widening of <br /> the crossroads up to 100 ft. in each direction where necessary to provide intersection operation at an acceptable LOS. In addition a wade <br /> separated Highway/Rail crossing will be evaluated. This project will be developed following the ETDM methodology. Project Cost: $1.3 mil Ion. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Krome Avenue North PD&E Study PROFESSIONAL SERVICES CONSTRUCTION (If <br /> Miami-Dade County, FL Applicable) <br /> 2006 <br />b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm <br /> Senior Project Engineer. This study investigated the proposed widening of Krome Avenue, one of South Florida's most rural corridors. The <br /> project included a detailed safety analysis of the corridor and comprehensive alternative generation and selection process. Furthermore, the <br /> study required the preparation of preliminary engineering reports and master plans as well as extensive environmental work and coordination <br /> with all the regulatory agencies. Project Cost: $1 million <br /> (1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED <br /> NW 14th Street Access Improvements to 1-395 PD&E Study PROFESSIONAL SERVICES CONSTRUCTION (If <br /> Miami-Dade County, FL Applicable) <br /> 2005 <br />c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm <br /> Project Manager. PD&E Study for the addition of on/off ramps to 1-95 and 1-395. Study requires a comprehensive PD&E analysis <br /> and IJR. The project includes preliminary and final engineering reports and master plans, traffic modeling and technical <br /> memorandum, and extensive public involvement with the Overtown area. Project Cost: $900,000. <br /> (1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED <br /> Eller Drive PD&E Study PROFESSIONAL SERVICES CONSTRUCTION (If <br /> Broward County, FL 2004 Applicable) <br />d (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with C1lrrent firm <br /> I <br /> Project Manager. Study for the grade-separation of Eller Drive, the primary access route into Port Everglades in Ft. Lauderdale, Florida. The <br /> study required a comprehensive analysis and the development of alternatives for providing an overpass over an important FEC rail spur to the <br /> South port area of the port. It also included improving the flow of traffic circulation between Port Everglades and Ft. Lauderdale International <br /> Airport. Project Cost: $1.5 million. <br /> (1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED <br /> NW 87th Avenue From NW 58th Street to Just North of PROFESSIONAL SERVICES CONSTRUCTION (If <br /> Okeechobee Road PD&E Study Applicable) <br /> Miami-Dade County, FL 2004 <br />e (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm <br /> Project Manager. PD&E Study for a 3-mile segment of this primary north/south urban arterial roadway. Study requires a <br /> comprehensive PD&E analysis to continue the four lanes from NW 58th Avenue to NW 103rd Street in Hialeah Gardens, including <br /> a thorough access management study and documentation, public involvement, the production of a traffic technical memorandum, <br /> preliminary and final engineering reports and master plans. Project Cost: $792, 236 <br /> <br />STANDARD FORM 330 (6/2004) <br />