Laserfiche WebLink
<br /> ~r:i~'i!~[.]:~~~=~~~.]~li:~ <br />12. NAME ~ 13.ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> Douglas Ruggiano, PE Structural Engineer a. TOTAL I b. ~TH CURRENT FIRM <br /> 18 <br />15. FIRM NAME AND LOCATION (City and State) <br /> Metric Engineering, Inc. <br />16. EDUCATION (DEGREE AND SPECIALlZA TlON) 17.CURRENT PROFESSIONAL REGISTRATION (STATE <br /> BSCE - Structures AND DISCIPLINE) <br /> P.EJFloridalCivil <br />18.0THER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, ete.) <br /> Florida Engineering Society (FES) <br /> 19. RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> 1-95 Bridge Widening over Lake Washington Road PROFESSIONAL SERVICES CONSTRUCTION (If <br /> Brevard County, FL Applicable) <br /> April 2005 <br />a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm <br /> Project involved the widening of bridge nos. 700123(NB) and 700040(SB) along 1-95 over Lake Washington Road. The twin 4 <br /> span 172 ft. long AASHTO Type II girder/slab bridges were widened by 18ft. Doug servces as the Engineer of Record. Doug <br /> performed the deck, girder and intermediate hammerhead pier designs. Estimated construction cost for bridge widening is <br /> approximately $800,000. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> 45th Street Bridge over FL Turnpike PROFESSIONAL SERVICES CONSTRUCTION (If <br /> Palm Beach County, FL Applicable) <br /> March 2007 <br />b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm <br /> Bridge replacement project consisting of replacing the existing bridge with a 62,000 sf, 486 ft. long, 4-span Florida Bulb T-72 <br /> girder/slab superstructure w/spans of 126 ft. to 134 ft. The bridge alignment is on a slight curve and the piers are skewed 40 <br /> degrees. Doug was part of the design team and performed the prestressed bridge analysis, slab design and multi column pier <br /> design founded on 18" square piles. Estimated construction cost of bridge is approximately $7.7 million. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 836 over SR 826 Bridge Repair PROFESSIONAL SERVICES CONSTRUCTION (If <br /> Miami-Dade County, FL Applicable) <br /> June 2000 December 2000 <br />c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Emergency Bridge Repair project dealing with repairing impact damaged AASHTO Girders., Doug performed field inspection to <br /> determine extent of damage and appropriate course of action. Doug was responsible for design and final construction <br /> document preparation. Doug worked closely with the FOOT Materials dept. in development of repair plans to include the use of <br /> CFRP laminates to strenghten prestressed girders with prestressed tendon damage. $220,000 Construction cost. <br /> (1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED <br /> DASH III Extension PROFESSIONAL SERVICES CONSTRUCTION (If <br /> Brevard & Volusia Counties, FL May 2006 Applicable) <br />d (3) BRIEF DESCRIPTION (Brief scope, ..size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm <br /> An ITS project that included 25 overhead highway cantilever OMS sign structures and 63 Mast Arm OMS Sign Structures. <br /> Doug served as the Engineer of Record and performed the design c1aculations for the structures and drilled shaft foundations <br /> for all the structures. Estimated construction cost for structures portion of project was $4.0 million. <br /> (1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED <br /> PROFESSIONAL SERVICES CONSTRUCTION (If <br /> Applicable) <br />e (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> <br />STANDARD FORM 330 (6/2004) PAGE <br />