Laserfiche WebLink
<br /> ~:I~'lIJl'jl~-@~ljJ=I:~~~~.]~li:g;? <br /> ~ -. . -. -.-. <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> Ross Shillingford, P.E. Project Engineer a. TOTAL I b. ~TH CURRENT FIRM <br /> 13 <br />15. FIRM NAME AND LOCATION (City and State) <br /> Metric Engineering, Inc./West Palm Beach, FL <br />16. EDUCATION (DEGREE AND SPECIALlZA nON) 17.CURRENT PROFESSIONAL REGISTRATION (STATE <br /> BSCE Florida Institute of Technology, 1995 AND DISCIPLINE) <br /> Florida PE# 56901 <br />18.0THER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> Florida Engineering Society, ASCE I FOOT Advanced Maintenance of Traffic <br /> 19. RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> 45th Street from Jog Road to Haverhill Road, PROFESSIONAL SERVICES CONSTRUCTION (If <br /> Palm Beach County, Florida Applicable) <br /> 2008 <br />a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm <br /> Project Manager and Engineer of Record. Existing two-lane 45th Street reconstructed to a four-lane divided, urban roadway, a distance of approximately 1.0 <br /> mile. It also included an elevated intersection & a bridge structure over Florida's Turnpike. Responsible for roadway & drainage design, signing & pavement <br /> marking and signalization. Included signal replacement at Haverhill Road and a new mast arm signal at Jog Road. $1,120,000 <br /> (1) TITLE AND LOCATION (City and State) 2) YEAR COMPLETED <br /> SR-7/US-441 From Broward/Palm Beach County Line to PROFESSIONAL SERVICES CONSTRUCTION (If <br /> Glades Road, Palm Beach County, Florida Applicable) <br /> FOOT District 4 2008 <br />b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm <br /> Project Manager and Engineer of Record- Design and plans preparation for the resurfacing and rehabilitation of the existing six-lane, divided, urban arterial in <br /> Broward County. Improvements include access management, drainage, signing, signalization, lighting and safety improvements. 4 existing span wire signals <br /> were replaced with mast arms and 3 existing span wire signals were upgraded. $813,000 <br /> (1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED <br /> SR-710 (Beeline Highway) from Military Trail to Northlake PROFESSIONAL SERVICES CONSTRUCTION (If <br /> Boulevard, Palm Beach County, Florida Applicable) <br /> FOOT District IV 2005 2007 <br />c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm <br /> Project Manager and Engineer of Record responsible for the design and plans preparation for the rehabilitation and widening of 3.5 miles of a 4 lane divided <br /> limited access highway in Palm Beach County. The project involved milling and resurfacing, cross slope correction, drainage improvements, and the preparation <br /> of lighting, signalization and maintenance of traffic plans. Included span wire signal upgrades at Haverhill Road and a signal replacement with mast arms at <br /> Northlake Boulevard. $570,000 <br /> (1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED <br /> Congress Avenue, Melaleuca Ln / Lake Worth Rd Intersection PROFESSIONAL SERVICES CONSTRUCTION (If <br /> Improvement 2004 Applicable) <br /> Palm Beach County, FL 2006 <br />d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm <br /> Project Engineer -Plans and specifications for widening the existing 4-lane roadway to a 6 lane divided urban arterial including a box culvert extension over the <br /> L-12 Canal, roadway, drainage, pavement markings, permitting and coordination with utilities and permitting agencies, right of way mapping and additional <br /> services. Improvements included realignment to accommodate additional turn lanes, optimize use of the existing right-of-way, minimize business damages and <br /> access impacts to adjacent gas stations and other adjacent property owners. $276,700 <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Silver Beach Road from Congress Avenue to Old Dixie PROFESSIONAL SERVICES CONSTRUCTION (If <br /> Highway On-going Applicable) <br /> Palm Beach County, Florida <br />e (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm <br /> Project Engineer and Engineer of Record - Reconstruction of approximately 1 mile of the existing two-lane undivided, rural roadway to a 3-lane divided urban <br /> arterial with roundabouts. Design involved a combination of a dry detention roadside swale and a wet detention offsite pond. The project also involved an <br /> alignment study, R/W acquisition, complex access management and property impacts issues, and a new signal at Old Dixie Highway. ONGOING $470,000 <br /> <br />STANDARD FORM 330 (6/2004) <br />