|
<br /> gl:'~'i.lj .', l~i(!Iiif[337lrl::t :~"i.] ~I ~I ::tL,~ii.] ~ I.:~f'
<br /> ~~~'JI!I=1;"W,JJ)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br /> Edgar Munoz, PE Project Engineer a. TOTAl I ~ WITH CURRENT FIRM
<br /> 10
<br />15. FIRM NAME AND LOCATION (City and State)
<br /> Metric Engineering, Inc./West Palm Beach
<br />16. EDUCATION (DEGREE AND SPECIALlZA TION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE
<br /> BSCE Universidad de Puerto Rico AND DISCIPLINE)
<br /> Florida PE#65440, Illinois PE#062-058373
<br />18.0THER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br /> N/A
<br /> 19. RELEVANT PROJECTS
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> SR-7/US441 from BrowardlPalm Beach County Line to Glades PROFESSIONAL SERVICES CONSTRUCTION (If
<br /> Road Applicable)
<br /> Broward County, Florida 2008
<br />a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm
<br /> Project Engineer - Design and plans preparation for the resurfacing and rehabilitation of the existing six-lane, divided, urban arterial
<br /> in Broward County. Improvements include access management, drainage, signing, signalization, lighting and safety improvements.
<br /> 4 existing span wire signals were replaced with mast arms and 3 existing span wire signals were upgraded. $813,000
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Northlake Blvd. from Seminole Pratt to Coconut Road PROFESSIONAL SERVICES CONSTRUCTION (If
<br /> Palm Beach County, Florida Applicable)
<br /> 2006
<br />b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm
<br /> Project Engineer/Preliminary and final roadway design, drainage design and permitting of a 3.4-mile reconstruction project.
<br /> Included signal improvements at Coconut Boulevard and a new signal at Grapeview Boulevard. $818,219
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Silver Beach Road from Congress Avenue to Old Dixie PROFESSIONAL SERVICES CONSTRUCTION (If
<br /> Highway Applicable)
<br /> Palm Beach County, Florida Ongoing
<br />c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm
<br /> Project Engineer - Project Engineer and Engineer of Record - Reconstruction of approximately 1 mile of the existing two-lane
<br /> undivided, rural roadway to a 3-lane divided urban arterial with roundabouts. Design involved a combination of a dry detention
<br /> roadside swale and a wet detention offsite pond. The project also involved an alignment study, RNJ acquisition, complex access
<br /> management and property impacts issues, and a new signal at Old Dixie Highway. ONGOING $470,000
<br /> (1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
<br /> 45th Street from Jog Road to Haverhill Road, PROFESSIONAL SERVICES CONSTRUCTION (If
<br /> Palm Beach County, Florida 2008 Applicable)
<br />d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm
<br /> Project Engineer - Existing two-lane 45'n Street reconsirucied to a four-lane divided, urban roadway, a distance of approximaiely 1.0
<br /> mile. It also included an elevated intersection & a bridge structure over Florida's Turnpike. Responsible for roadway & drainage
<br /> design, signing & pavement marking and signalization. Included signal replacement at Haverhill Road and a new mast arm signal
<br /> at Jog Road. $1,120,000
<br /> (1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
<br /> SR-710 (Beeline Highway) from Military Trail to Northlake PROFESSIONAL SERVICES CONSTRUCTION (If
<br /> Boulevard, Palm Beach County, Florida 2005 Applicable)
<br /> FOOT District IV 2007
<br />e (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm
<br /> Project Engineer - responsible for the design and plans preparation for the rehabilitation and widening of 3.5 miles of a 4 lane
<br /> divided limited access highway in Palm Beach County. The project involved milling and resurfacing, cross slope correction,
<br /> drainage improvements, and the preparation of lighting, signalization and maintenance of traffic plans. Included span wire signal
<br /> upgrades at Haverhill Road and a signal replacement with mast arms at Northlake Boulevard. $570,000
<br />
<br />STANDARD FORM 330 (6/2004)
<br />
|