Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(complete one Section E for each key person.) <br /> <br />12. NAME <br /> <br />13. ROLE IN THIS CONTRACT <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br /> <br />Orlando A. Rubio, P.E. <br /> <br />Project Manager <br /> <br />17 <br /> <br />8 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Craig A. Smith & Associates, Inc. <br />Boca Raton, FL <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND <br />DISCIPLINE) <br /> <br />University of Florida, Gainesville, Florida- <br />August 6, 1988, Bachelor of Science in Civil <br />Engineering <br />Miami Dade Community College-South <br />Campus, Miami, Florida-December 1985 <br />Associates in Arts <br /> <br />Professional Engineer <br />State of Florida <br />License No. 48265 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organization, Training, Awards, etc.) <br /> <br />U. of Miami-Continuing Studies - SFWMD Tech./Professional Program <br />U. of Wisconsin - HEC 2 & WSPRO (3.6 CEU) - Computing water surface profiles for Floodplains &. <br />Bridge Hydraulics <br />Palm Beach Community College - Institute of Government; "On Becoming A Supervisor" (0.6 CEU) <br />& "Writing for Management" (0.6 CEU) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (CITY AND STATE) (2) YEAR COMPLETED <br /> 1-95 Pump Station PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE) <br /> Pembroke Park, FL 2004 2006 <br />a. <br /> 3) BRIEF DESCRIPTION (brief scope, size, cost, etc.) AND SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> Project Manager: <br /> FDOT Corridor Drainage Project, 1-95/Pembroke Park Road. Project includes 84- <br /> inch drainage pipes; micro-tunneling; pump station with four (4) pumps (200 HP <br /> motors) each capable of 40 CFS; ditch construction and C-l0 canal dredging. This <br /> project was on a fast track from preliminary design to construction; completion <br /> took only 25 months. Responsible for planning design, permitting, bidding, <br /> construction management and construction observation services. <br /> (1) TITLE AND LOCATION (CITY AND STATE) (2) YEAR COMPLETED <br /> Stormwater Master Plan & Construction Plans PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE) <br />b. Oakland Park, FL 2008 On-going <br /> (3) BRIEF DESCRIPTION (briefscope, size, cost, ete.) AND SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> Project Manager: <br /> Complete stormwater evaluation and master planning for the City of Oakland Park. <br /> Implementation of planning through City & Grant Funding (CDBG) & FEMA. <br />- <br />