Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(complete one Section E for each key person.) <br /> <br />12. NAME <br /> <br />13. ROLE IN THIS CONTRACT <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br /> <br />Peter A. Kunen, P.E. <br /> <br />Project Engineer <br /> <br />25 <br /> <br />11 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Craig A. Smith & Associates, Inc. <br />Boca Raton, FL <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA nON) <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND <br />DISCIPLINE) <br /> <br />Bachelor of Science, Civil/Environmental <br />Engineering - 1997 <br />Florida International University, Miami, FL <br /> <br />Professional Engineer <br />State of Florida <br />License No. 60730 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organization, Training, Awards, etc.) <br /> <br />A.S.C.E. and A.W.W.A. <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (CITY AND STA TE) (2) YEAR COMPLETED <br /> Stormwater Pump Station Design PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE) <br /> Golden Beach, FL 2009 On-going <br />a. <br /> 3) BRIEF DESCRIPTION (brief scope, size, cost, etc.) AND SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> Project Engineer: <br /> A pumped stormwater collection, treatment and disposal system to serve a portion <br /> of the Town of Golden Beach. <br /> (1) TITLE AND LOCATION (CITY AND STATE) 2 YEAR COMPLETED <br /> Stormwater Pump Station Design PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE) <br />b. Sweetwater, FL 2000-2010 On-going <br /> (3) BRIEF DESCRIPTION (briefscope, size, cost, etc.) AND SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> Project Engineer: <br /> Six-phase stormwater master plan. Gravity stormwater collection system, pump <br /> stations and forcemain distribution system. Planning, design, permitting, bidding <br /> and construction engineering services. <br />c. <br /> (1) TITLE AND LOCATION (CITY AND STATE) (2) YEAR COMPLETED <br /> 1-95 Pump Station PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE) <br /> Pembroke Park, FL 2004 2006 <br /> (3) BRIEF DESCRIPTION (briefscope, size, cost, etc.) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> Project Engineer: <br /> FDOT Corridor Drainage Project, 1-95/Pembroke Park Road. Project includes 84- <br /> inch drainage pipes; micro-tunneling; pump station with four (4) pumps (200 HP <br /> motors) each capable of 40 CFS; ditch construction and C-10 canal dredging. This <br /> project was on a fast track from preliminary design to construction; completion <br /> took only 25 months. Responsible for planning design, permitting, bidding, <br /> construction management and construction observation services. <br /> '1 rl f= ANn fro/TV II <In C'TII Tel (2 YEAR COMPLETED <br />