Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(complete one Section E for each key person.) <br /> <br />12. NAME <br /> <br />13. ROLE IN THIS CONTRACT a. TOTAL <br /> <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT FIRM <br /> <br />Matthew G. Harold, P.E. <br /> <br />Designer 13 <br /> <br />2 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br /> <br />Craig A. Smith & Associates, Inc. <br />Boca Raton, FL <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />Master of Engineering, Civil with a <br />Concentration in Water Resources, <br />1997; Bachelor of Science, Industrial <br />Engineering, 1993 <br /> <br />Professional Engineer <br />State of Florida <br />License No. 55689 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organization, Training, Awards, etc.) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (CITY AND STATE) (2) YEAR COMPLETED <br /> 89th Bayshore Drive Drainage Improvements PROFESSIONAL SERVICES ONSTRUCTION (IF APPLICABLE) <br /> Miami-Dade County, Florida 2008 <br />a. <br /> (3) BRIEF DESCRIPTION (briefscope, size, cost, etc.) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> Drainage improvements to low lying residential area which frequently experiences <br /> flooding. <br /> (1) TITLE AND LOCATION (CITY AND STA TE) 2) YEAR COMPLETED <br /> Master Drainage Study PROFESSIONAL SERVICES L;ONSTRUCTION (IF APPLICABLE <br />b. Tamarac, Florida 2007 <br /> 3) BRIEF DESCRIPTION (briefscope, size, cost, etc.) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> Complete master drainage study of the entire City of Tamarac. <br /> (1) TITLE AND LOCATION (CITY AND STA TE) 2) YEAR COMPLETED <br /> Lake Worth Drainage District Culvert Improvements PROFESSIONAL SERVICES ONSTRUCTION (IF APPLlCABLI <br />C. Greenacres, Florida 2007 <br /> (3) BRIEF DESCRIPTION (briefscope, size, cost, etc.) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> Replacement of three (3) canal transmission culverts. <br /> 1) TITLE AND LOCATION (CITY AND STATE) 2 YEAR COMPLETED <br /> S Broward Drainage District S-9 & S-10 Basin Study PROFESSIONAL SERVICES ONSTRUCTION (IF APPLlCABLI <br />d. South Western Broward County, Florida 2006 <br /> (3) BRIEF DESCRIPTION (briefscope, size, cost, etc.) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> Drainage study of proposed outfall improvements and their potential affects on <br /> residents. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br /> <br />~---- <br />