My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Assoc. #2
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
Craig A. Smith & Assoc. #2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2011 4:14:08 PM
Creation date
11/16/2010 4:39:54 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(complete one Section E for each key person.) <br /> <br />12. NAME <br /> <br />13. ROLE IN THIS CONTRACT <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br /> <br />AI Caruso <br /> <br />Designer <br /> <br />22 <br /> <br />11 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Craig A. Smith & Associates, Inc. <br />Boca Raton, FL <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA TION) <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND <br />DISCIPLINE) <br /> <br />Associates Degree in Engineering <br />Technology Middlesex County College, <br />New Jersey, 1978 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (publications, Organization, Training, Awards, etc.) <br /> <br /> (1) TITLE AND LOCATION (CITY AND STATE) 2 YEAR COMPLETED <br /> 1-95 Pump Station PROFESSIONAL SERVICES ONSTRUCTION (IF APPLICABLE) <br /> Pembroke Park, FL 2004 2006 <br />a. <br /> 3) BRIEF DESCRIPTION (brief scope, size, cost, etc.) AND SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> Designer: <br /> FDOT Corridor Drainage Project, 1-95/Pembroke Park Road. Project includes 84- <br /> inch drainage pipes; micro-tunneling; pump station with four (4) pumps (200 HP <br /> motors) each capable of 40 CFS; ditch construction and C-10 canal dredging. This <br /> project was on a fast track from preliminary design to construction; completion <br /> took only 25 months. Responsible for planning design, permitting, bidding, <br /> construction management and construction observation services. <br /> (1) TITLE AND LOCATION (CITY AND STA TE) 2 YEAR COMPLETED <br /> Stormwater Master Plan and Construction Plans PROFESSIONAL SERVICES :;ONSTRUCTION (IF APPLICABLE) <br />b. Oakland Park, FL 33334 2008 On-going <br /> (3) BRIEF DESCRIPTION (briefscope, size, cost, ete.) AND SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> Designer: <br /> Complete Stormwater evaluation and master planning for the City of Oakland Park. <br /> Implementation of planning through City and Grant Funding (CDBG) & FEMA. <br /> (1) TITLE AND LOCATION (CITY AND STA TE) (2) YEAR COMPLETED <br /> Phase II of the Stormwater Master Plan PROFESSIONAL SERVICES ONSTRUCTION (IF APPLICABLE) <br />c. Golden Beach, FL 2007 On-going <br /> 3) BRIEF DESCRIPTION (brief scope, size, cost, ete.) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> Designer: <br /> A pumped stormwater collection, treatment and disposal system to serve a portion <br /> of the Town of Golden Beach. <br /> <br />19. RELEVANT PROJECTS <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.