My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
EAC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2010 8:40:21 AM
Creation date
11/16/2010 4:47:31 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3.5 Coordination & Communication <br />EAC recognizes the importance of coordination and commUnlCltlOn during the course of the project. f\S <br />such, regular in-house meetings will be held to ensure coordination and communication, Ef\C'S ptClject <br />manager will sen'e as the focal point of coordination and prm'ide timely response and prompt follow-up for <br />project related issues. He will be the City's link with the project team. <br /> <br />3.6 Quality Control & Assurance <br />E/\C considers quality control management integral to our ability to prO\'iding sen'ices and ha\"e assigned <br />experienced key staff members to do our re\'iews and ensure that the design and constructabilit~, of our <br />deli\"erables are feasible and ha\'e been thotClughly \"etted and screened for errors and omissions. Our <br />Qf\/QC constructabilin' re\"iews will target the completeness of designs to ensure that they are feasible and <br />occur without ad\'erse fIeld impacts and changes, \Ve ha\"e detailed our qualit~, management approach in later <br />section(s) of this response package, <br /> <br />3.7 Budget and Schedule Management Plan <br />I~AC is complete]~' familiar with the processes im'oked in scheduling projects. We utilize <br />i\licrosoft Project and Prima\'era software for scheduling all of our ptCljects. Working with <br />the City and key members of the project team, f-:o:AC's project manager will identify all the <br />discrete acti\"ities, resources and efforts required for each task, and prepare the ptClject <br />schedule. Inputs to the schedule will be acti\"ities, duration of each acti\'ity, predecessors <br />and successors to each acti\"ity, efforts relluired to complete each acti\'ity, and personnel <br />assigned to successfully completc cach acti\"ity, <br /> <br />~. <br /> <br />~ <br /> <br />'V\~, <br />1\ <br />" <br /> <br />/ <br /> <br />'- <br /> <br />This process will result in a "Project Schedule" identifying aC!l\'ltleS, which are on the <br />"Critical Path" as well as float time in other acti\"ities. This is important because acti\'ities <br />on the "Critical Path" cannot slip without ad\"crsely impacting the "Project Schedule." E/\C's ptClject <br />manager will be responsible for monitoring all acti\'ities and assuring the proper le\"el of staffIng to strictly <br />adhere to the "Project Schedule". Team mcetings will be held on a regular basis to re\"iew progress and assure <br />compliance with the "PtClject Schedule," The schedule should satisf~' the following parameters: <br />· The time frame should be as needed and agreed with the City's Project "'1;lOager. <br />· I t should include adelluate time for each step taking ad\"antage of parallel steps as much as possiblc. <br />· I t should includc time for the re\"iews, re\'isions and apprm'al by the City. <br />· It should adequately consider interim jurisdictional agency re\'iews. <br />. The time steps should bc realistic based on project constraints. <br /> <br />SUreTn* <br />'*- <br /> <br />.......twa","''''--y.,,..,,,, <br /> <br />Adherence to Budget - One of the keys to the success of any project is an understanding and adherence to <br />its scope and budgetar\' requirements, The rwo items work complimentarih- and must be c1osel~' monitored <br />to ensure that the City's goals for the project are achie\"ed, Task Leaders/ Lead Engineers on the proposed <br />team will work to ensure that budget goals match adequate scope of rel]uirements. The use of \'alue <br />engineering measures will be implemented as necessary to enable proposed design intent to be consistent with <br />budget allocations. <br /> <br />In our pre\'ious ptCljects we ha\'e taken a positi\'e approach of inquiring directh' ftClm contractors on the <br />current prices of materials and specialized construction methods, \Ve understand that construction industry <br />costs are not stable and thereforc current information will be pertinent to ensure that proper estimating is <br />achie\'ed. I t is important to notc that on our efforts with budget conttCl!, we will ser\"e completely as an <br />extension of the Cit~, - watching out to ensure that the budget limitations of the ptClject are not surpassed, <br /> <br />](I <br />
The URL can be used to link to this page
Your browser does not support the video tag.