<br />Peter Worthy P .E.
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />Senior Mechanical Engineer
<br />
<br />14. YEARS EXPERIENCE
<br />a, TOTAL b. WITH CURRENT
<br />FIRM
<br />
<br />12. NAME
<br />
<br />54
<br />
<br />4
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Pro'ect Caine / Fort Lauderdale FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />BE Yale University / Mechanical Engineering
<br />BS Yale University / Industrial Engineering
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />STRENGTHS Experience in mechanical work includes responsibility for design, field supervision and trouble - shooting of numerous
<br />industrial and commercial heating, ventilating and air conditioning installations, ranging from minimum size of 50 tons to installations over
<br />2,000 tons. Other systems include constant temperature - humidity rooms, low temperature rooms and freezers, low temperature rooms,
<br />dust collections systems, high pressure piping systems, service piping, process piping and plumbing
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />FL # 12116 Mechanical Engineering
<br />
<br />Background as a test and balance engineer as well as design engineer has led to forensic engineering experience as expert witness for
<br />both plaintiff and defense attorneys. Areas of litigation have included piping system corrosion, high humidity's, mold and mildew,
<br />pumping deficiencies, condensation and inadequate HVAC capacities. As test and balance consultant for Sroward County School System,
<br />much work has been done in solving poor IAQ schools, both inadequate ventilation and mold and mildew.
<br />
<br />PROFESSIONAL ORGANIZA TlONS
<br />
<br />American Society of Heating, Refrigerating and Air Conditioning Engineers, Inc.
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State)
<br /> Embraer Warehouse, 40,000 sf., Fort Lauderdale FL
<br />a. [2J Check if project performed with current firm
<br /> (3) BRIEF OESCRIPTION (Brief scope, size, cost, ete.) AND SPECIFIC ROLE
<br /> This project included 6 DX rooftop units and one split system for the office area. The project included a large warehouse
<br /> Area, offices, bathrooms and a secure storaqe area.
<br /> (1) TITLE AND LOCATION (City and State)
<br /> Copa Night Club, Fort Lauderdale FL
<br />b. [2J Check if project performed with current firm
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br /> Total renovation of the 20,000 sf night club which included two restaurants, 3 bars, restrooms and multi zoned DX -AC
<br /> units. The desiqn also included a smoke evacuation system.
<br /> (1) TITLE AND LOCATION (City and State)
<br /> Nanay Community Center, North Miami Beach, FL
<br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, ete.) ANa SPECIFIC ROLE [2J Check if project performed with current firm
<br /> This project consisted of the renovation of a two story, 8,000 sf community center. The renovation consisted of
<br /> designing a completely new AC system which consisted of 6 split systems and provisions for providing a new third floor
<br /> addition.
<br /> (1) TITLE AND LOCATION (City and State)
<br /> Cleveland Clinic Hospital Center (Weston, FL)
<br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [2J Check if project performed with current firm
<br /> Various Projects at the Hospital including a 1,000 sf addition to the Hospital Data Center. The design included a
<br /> standalone Liebert Unit, UPS system and a fire suppression system. We have also done an MRI suite an Endoscopy
<br /> suite, The Residents sleep area and a 40,000 sf tenant fit out for their data and call center.
<br /> (1) TITLE AND LOCATION (City and State)
<br /> Lake Point Towers, Singer Island, FL
<br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, ete.) AND SPECIFIC ROLE D Check if project performed with current firm
<br /> The project consisted of the replacement of all the roof top AC equipment for a high rise condominium on Singer Island
<br /> FL.
<br />
<br />STANDARD FORM 330 (1/2004) PAGE 2
<br />
|