<br />12, NAME
<br />Robert B. Caine, PE
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13, ROLE IN THIS CONTRACT
<br />Project Manager a, TOTAL
<br />39
<br />
<br />14, YEARS EXPERIENCE
<br />I b. WITH C~RRENT FIRM
<br />
<br />15, FIRM NAME AND LOCATION (City and State)
<br />Project Caine, Inc., Fort Lauderdale, FL
<br />16, EDUCATION (DEGREE AND SPECIALIZATION)
<br />BSEE Villanova University, Electrical Engineering
<br />
<br />17 CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
<br />FL # 37637 Electrical Engineer
<br />
<br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc)
<br />Articles published: INDUCED IMPEDENCE ON TRANSFORMER FEEDERS - EC&M, 1995; HIGH TECHNOLOGY BUILDINGS - Washington Business Joumal, 1990;
<br />TELECOMMUNICA TlONS FOR BUILDINGS - Electrical Consultant, 1988; COMPUTERIZED ESTlMA TlNG - Electrical Consultant, 1987; UPS SYSTEMS DESIGN-
<br />Electrical Systems Design, 1986
<br />Lectures: Community Transportation Systems - EV (Electric Vehicle) Ready Broward, 1999; Electronic Technology for the Global Market Place - AlA conference 1996; Ice
<br />Storage Systems - FEFPA conference 1995; Uniform Wiring Systems - FEFPA conference 1993; Intelligent Buildings - TMACA Conference 1988; Uniform Wiring Systems-
<br />Chicago Conference 1989
<br />Professional Organizations: Puerto Rico Hotel Association, IESNA (President and formed the PR section 2003), EV Ready Broward (Committee Chairman 2001), FES,
<br />AlA, NSPE, TMACA (President 1988), IEEE, Madrid Chamber of Commerce 1991, American Club (Madrid 1990)
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Broward County Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Broward County, FL 2008 Varied
<br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE .lXJ Check it project performed with current firm
<br />Project Caine, Inc, has been working with Singer Architects and BHA Architectural Consultants on two continuing services contracts
<br /> with Broward County for the past (2) two years. Projects include office renovations, escalator upgrades, and an emergency generator
<br /> upgrade.
<br /> Role: Project Manager
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Fort Lauderdale Airport Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Fort Lauderdale, FL 2009 Varied
<br />b. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc) AND SPECIFIC ROLE ~ Check it project performed with current firm
<br />Part of the Parson's team for the continuing services contract at the airport for construction management. There are numerous projects
<br /> that they will be awarding to a total of 16 firms'.
<br /> Role: Project Manager
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> City of Miami Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Miami, FL 2007 Varied
<br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ~ Check it project performed with current firm
<br />Various projects for the City of Miami including the renovation to the pump room for the Gibson Park Pool and the renovation of the
<br /> Roberto Clemente Community Center.
<br /> Role: Project Manager
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> FAU Continuing Engineering Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Boca Raton, FL 2007 Varied
<br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ~ Check it project performed with current firm
<br />Numerous small renovation projects such as offices, laboratories, gymnasiums, lighting studies, lightning protection studies and design,
<br /> fire alarm systems, etc.
<br /> Role: Project Manager
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> FlU Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Miami, FL 2008 Varied
<br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ~ Check it project performed with current firm
<br />Numerous small renovations at the university which included laboratories, gymnasiums, offices and classrooms.
<br /> Role: Project Manager
<br />
<br />STANDARD FORM 330 (6/2004) PAGE 1
<br />
|