|
<br />ro1ectfCAINE
<br />
<br />~lJ1~~~~
<br />
<br />filo~ rJr;::n'tI~mj\~~
<br />
<br />Education
<br />
<br />Bachelor of Science in Electrical
<br />Engineering, Villanova University
<br />
<br />Graduate Studies in
<br />Telecommunications, George
<br />Washington University
<br />
<br />Registration
<br />
<br />Professional Engineer - FL, DC,
<br />PA,NC,SC,GA,MD,VA,AL
<br />
<br />Professional Affiliations
<br />
<br />Fort Lauderdale Chamber of
<br />Commerce -Trustee
<br />Broward Days
<br />Fort Lauderdale Utility Advisory
<br />Committee
<br />Puerto Rico Hotel Association
<br />IESNA (President and formed the
<br />PR section 2003)
<br />EV Ready Broward (Committee
<br />Chairman 2001)
<br />Florida Engineering Society (FES)
<br />AlA
<br />NSPE
<br />TMACA (President 1988)
<br />IEEE
<br />Madrid Chamber of Commerce,
<br />American Club (Madrid 1990)
<br />
<br />Project Caine, Inc.
<br />1948 East Sunrise Blvd.
<br />Suite 1
<br />Fort Lauderdale, FL 33304
<br />Phone: 954.767.8886
<br />Fax: 954.767.9934
<br />E-fax: 954.337.4665
<br />
<br />Background
<br />
<br />Mr. Caine has a wealth of expertise in his field having over 30 years experience in
<br />design and construction of sophisticated building systems. As President of Project
<br />Caine, Inc., he brings the knowledge of starting and growing branch offices,
<br />bringing divisions back to profitability, developing client loyalty, international
<br />experience, and polished presentation skills. Understanding the need to establish
<br />and nurture his client relationships, Mr. Caine prides himself in being involved from
<br />the onset in all of the firm's projects.
<br />
<br />Experience
<br />
<br />Broward County Continuing Services Contract, Broward County, FL
<br />Project Caine, Inc. has been working with Singer Architects and BHA
<br />Architectural Consultants on two continuing services contracts with Broward
<br />County for the past (2) two years. Projects include office renovations, escalator
<br />upgrades, and an emergency system upgrade to the County Courthouse.
<br />
<br />City of Miami Continuing Services Contract, Miami, FL
<br />Project Caine, Inc. provided MEP services on various projects for the City of
<br />Miami including the renovation to the pump room for the Gibson Park Pool and the
<br />renovation of the Roberto Clemente Community Center.
<br />
<br />Pompano Beach Continuing Services Contract, Pompano Beach, FL
<br />Project Caine, Inc. is providing MEP services under this continuing services
<br />contract which consists of various miscellaneous engineering projects.
<br />
<br />Fort Lauderdale Airport Continuing Services Contract, Fort Lauderdale, FL
<br />As part of the Parson's team for the continuing services contract at the airport for
<br />construction management, Project Caine, Inc. provided MEP services on
<br />numerous projects.
<br />
<br />FAU Continuing Engineering Services Contract, Boca Raton, FL
<br />Project Caine, Inc. provided MEP services on numerous small renovation projects
<br />such as offices, laboratories, gymnasiums, lighting studies, lightning protection
<br />studies and design, fire alarm systems, etc.
<br />
<br />FlU Continuing Services Contract, Miami, FL
<br />Project Caine, Inc. provided MEP services on numerous small renovations at the
<br />university which included laboratories, gymnasiums, offices and classrooms.
<br />
<br />City of Hallandale Adult Center, Hallandale, FL
<br />Project Caine, Inc. provided MEP services for the electrical design included
<br />lighting and power for two soccer fields and one baseball ball field. Lighting was
<br />designed to achieve 50 foot-candles on the fields per the city standards.
<br />
<br />T responsive engineering
<br />
|