My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FTE
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
FTE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2010 9:25:16 AM
Creation date
11/17/2010 9:25:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />FTE's Qualifications I III <br /> <br />SCHEDULING <br /> <br />FTE is committed to provide the City of Sunny Isles Beach with a quality project on schedule. FTE values the <br />importance of meeting milestone dates, review dates, and final submittal dates with immediate response. We <br />also understand that a schedule is intended not only for the consultant, but also for the City to coordinate their <br />resources for reviewing submittals and for reporting to other City members. FTE is committed to meeting the <br />City's schedule and budget requirements, as well as, assign the most qualified staff to carry out the work <br />received under this project. <br /> <br />COST CONTROL <br /> <br />Costs will be controlled by innovative concepts that will be discussed during the project. It is our policy to <br />provide the most of value engineering concepts through cost-effectiveness for the conditions given, FTE have <br />demonstrated these capabilities on previous projects of this type. Cost control is provided through a custom <br />accounting system software, which tracks project costs and provides project performance and billing <br />information. FTE's Project Managers uses this accounting information and project status to track performance <br />on a regular basis. The accounting software system was designed after a careful review of both FTE's needs and <br />the needs of our client base. FTE tailors the system to perform based on a lump sum fee or cost-plus-a fixed-fee <br />basis. Furthermore, a detailed schedule of each project allows FTE's project managers to control more <br />efficiently and effectively, while keeping project teams organized to meet the objective of the organization. <br /> <br />,QA/QCPROGRAM ,-~ -. - ,:.-,---,~~--'- :----, , : <br />..,."~ .. ",~ "".. "'"' * ~ .. ~ .. ... '" ,~ .. , l t" , .. ~ <br /> <br />FTE is committed to providing accurate, error-free documents and reports for all <br />products related with each task assigned as part of this contract. We are aware that <br />high level of quality expected from the traffic engineering consultants to the general <br />public is paramount. This plan includes as a minimum the following issues to ensure <br />that the production meets accuracy and timeliness: <br /> <br />· Check and balances. <br />· Progress Report Monitoring <br />· Solutions that comply with FOOT standards. <br />· Deal with errors-omissions. <br />. Verification of accuracy of data collection equipment, and field procedures. <br />Training of staff in compliance with QA/QC procedures updated standards and <br />methodologies. <br />Integrated reviews of all work measurement levels, field observations, <br />guidelines, plans, goals, etc. <br />. Filing documentation with internal monitoring and audits of production <br />. Cost Control <br /> <br /> <br />.......~ <br /> <br />To meet this goal FTE has constructed a Quality Control Plan that utilizes the <br />principals in the Shewhart Cycle. FTE expanded on this theory and created a plan <br />that allows one to develop Quality Control practices on a company wide scale and <br />for specialized projects. <br /> <br />Professional Engineering Services - RFQ#1004 01 <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.