My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Nutting Engineers #3
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
Nutting Engineers #3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2011 4:14:47 PM
Creation date
11/17/2010 9:33:05 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT <br /> QUALIFICATIONS FOR THIS CONTRACT KEY NUMBER <br /> (Present as many projects as requested by the agency, or 10 projects, if not specified. 3 <br /> Como/ete one Section F for each oroject.) <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br /> Joseph Caleb Center New Courthouse and Parking Garage, Miami PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2009 ongoing <br /> 23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER I b. POINT OF CONTACT I c. POINT OF CONTACT TELEPHONE NUMBER <br /> Miami Dade GSA (Gen Serv Admin) Mr. Alex Rodriguez, RA 305-375-5965 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT <br /> Perfonned preliminary geotechnical investigation in 2003 <br /> (c/o F.R. Aleman) when the design involved a proposed <br /> 8-9 story building. Nutting perfTomed an addtional <br /> geotechnical investigation in 2009, requested by Bennello <br /> Ajamil and Partners, as well as a Phase I and 1\ <br /> Environmental Assessments on the property. <br /> Portions of the site were filled with various types of debris <br /> to depths of approximately 12 feet causing large <br /> depressions in the pavement areas. We worked with the <br /> client and the structural engineer to provide the best <br /> economical solutions for foundation support. <br /> Currently plans include the phased construction of a four <br /> level parking garage and a separate 2-story courthouse <br /> annex building on the approximate 1.44 acre site. <br /> Project still in pre-construction phase. Nutting anticipates <br /> the construction material testing and threshold inspections <br /> for this project. <br /> 25. FIRMS FROM SECTION C INVOLVED WITH nTls PROJECT <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. Nutting Engineers of Florida, Inc. Miami, Florida Geotechnical Engineering Firm- full <br /> scope of services <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br /> <br />STANDARD FORM 330 (6/2004) PAGE F-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.