My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Nutting Engineers #3
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
Nutting Engineers #3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2011 4:14:47 PM
Creation date
11/17/2010 9:33:05 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects. if not specified. <br />Com Jete one Section F for each ro 'ect. <br /> <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br /> <br />4 <br /> <br />21. TITLE AND LOCATION (City and State) <br />FlU Football Stadium and Student Support Complex <br />Miami. Florida <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> <br />2007 <br /> <br />2009 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER b. POINT OF CO NT ACT <br />Florida International University Mr. Danny Paan <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />305-348-4405 <br /> <br />This project includes the construction of the new FootbalJ <br />Stadium with a final seating capacity of 45,000 people as <br />welJ as the new Student Support Complex to include <br />locker rooms, bathrooms and weight training areas. <br /> <br />The first phase of construction began with the dismantling <br />of the south stands bringing seating capacity to 18,000 <br />people featuring 1400 club seats, a 6500 SF Panther Club, <br />an upper concourse and 19 suites. The Current phase <br />includes the student support complex bringing the stadium <br />capacity to 45,000 people. <br /> <br />Nutting involvement included the visual inspection of <br />earthwork and site preparation and lead into the <br />construction materials testing of soil and concrete. We <br />also are performing the inspections including that of the <br />drilled shafts for the light poles and perfonnance oflight <br />weight pull tests on the roof. <br /> <br />Architect: Rossetti Architects <br />General Constractor: Odebrecht Construction <br /> <br />$50,000 <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. Nutting Engineers of Florida.. Inc. Miami, Florida Prime <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br /> <br />STANDARD FORM 330 (6/2004) PAGE F-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.