My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Nutting Engineers #3
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
Nutting Engineers #3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2011 4:14:47 PM
Creation date
11/17/2010 9:33:05 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT <br /> QUALIFICATIONS FOR THIS CONTRACT KEY NUMBER <br /> (Present as many projects as requested by the agency, or 10 projects, if not specified. 5 <br /> Como/ete one Section F for each oroiect.) . <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br /> Miami Children's Hospital, Miami PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2009 ongoing <br /> 23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER I b. POINT OF CO NT ACT I c. POINT OF CONTACT TELEPHONE NUMBER <br /> Miami Childrens Hospital Mr. Robert Nowland, VP 305-668-5519 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT <br /> Parking Garage: Proposed construction is to be a Additional projects for the Hospital include a central <br /> 4-story parking garage of approximately 240,000 energy plant expansion in 2007 (3-story, 46,380 SF <br /> gross square feet. The structure is to be supported including office space, generator room storage, <br /> on 18 inch diameter; 200 ton auger cast piles and is installation of a 20,000 gallon underground storage <br /> to be constructed of precast concrete components. tank), the West Kendall Generator Pad in 2009, the <br /> The first level is to be slab-on-grade construction. Dan Marino 2nd Floor Expansion in 2005. <br /> Geotechnical engineering/exploration, pile load test <br /> monitoring, pile installation monitoring, construction <br /> materials testing, threshold inspection services. <br /> Construction recently underway. <br /> Bed Tower: six-story tower with a 48,000 SF <br /> footprint. To date, Nutting has performed the Additional contact: <br /> geotechnical investigation (April 2010). <br /> Ms. Karen Weichold <br /> Anticipated: pile load test monitoring, pile installation Arellano Construction Company <br /> monitoring, construction materials testing, threshold Phone: (305) 994.9901 x109 <br /> inspection services. Cell: (786) 282.1537 <br /> Mr. Ronald Ference <br /> Miami Childrens Hospital <br /> Phone: (786) 624.2475 <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. Nutting Engineers of Florida, Inc. Miami, Florida Geotechnical Engineering Finn- Full <br /> scope of services <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br /> <br />STANDARD FORM 330 (6/2004) PAGE F-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.