My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Nutting Engineers #3
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
Nutting Engineers #3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2011 4:14:47 PM
Creation date
11/17/2010 9:33:05 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT <br /> QUALIFICATIONS FOR THIS CONTRACT KEY NUMBER <br /> (Present as many projects as requested by the agency, or 1 0 ~~jects, if not specified. 8 <br /> Comolete one Section F for each oroiect. <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br /> Memorial Regional Hospital Miramar Expansion-various buildings PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Hollywood, Florida 2005 ongoing <br /> 23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER I b. POINT OF CONTACT 1 c. POINT OF CONTACT TELEPHONE NUMBER <br /> Memorial Healthcare Systems Mr. Roger Pitts 954-433-7184 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT <br /> Nutting has performed testing on numerous buildings, Memorial Hospital West - Timeline: 2009 <br /> parking garages, central energy plants, etc. for their main Cancer Institute Cyberknife expansion <br /> hospital as well as various off campus locations. The 5-story patient tower <br /> testing services provided include geotechnical central energy plant <br /> engineering/exploration, pile load testing, pile installation <br /> monitoring, jet grouting underpin monitoring, construction Memorial Hospital West - Timeline: 2007 <br /> materials testing, threshold & special inspection services, Pediatric ER expansion <br /> phase I and phase II environmental property 9-story Master Plan Phase II ER/OR expansion <br /> assessments,vibroflotation monitoring, and chemical <br /> grouting on numerous buildings throughout the hospitals Memorial Hospital West - Timeline: 2006 <br /> expansion. Nutting's has an established relationship with Roadway evaluation <br /> Memorial Regional Hospital. Our Chief engineer has <br /> been providing testing services for Memorial Hosptial for <br /> appoximately 25 years. <br /> PROJECTS INCLUDE: Memorial Hospital Miramar - Timeline: 2005 <br /> Joe DiMaggio Children's Hospital - Timeline: Ongoing 7-story hospital <br /> 6-story hospital building 5-story medical office building <br /> 4-story parking garage Memorial Hospital Pembroke - Timeline: 2005 <br /> central energy plant <br /> pedestrian bridge connecting NICU and JD Hospital Urgent Care Facility <br /> 2, 2-story medical office buildings <br /> Memorial Regional Hospital - Timeline: 2009 Memorial Hospital West - Timeline: 2003 <br /> Phase II Neonatal Intensive Care Unit <br /> parking garage and central energy plant Construction of new hospital and medical office building. <br /> All phases of buildings, parking structures and drainage <br /> improvements. <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. Nutting Engineers of Florid~ Inc. Miami, Florida Geotechnical Engineering Fim1- full scope of <br /> services <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br /> <br />STANDARD FORM 330 (6/2004) PAGE F-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.