Laserfiche WebLink
<br />12, NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Camp/ere one Secrian E for each key person,) <br />13. ROLE IN THIS CONTRACT <br /> <br />Soheila Sadough, PhO, PE <br />Senior Structural Engineer <br />15, FIRM NAME AND LOCATION (City and State) <br />Beiswenger, Hoch & Associates, Inc" 510 Shotgun Road, Suite 400, Sunrise, FL 33326 <br />16, EDUCATION !DEGREE AND SPECIALlZA TlON) 17, CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br /> <br />Structural Designer <br /> <br />14, YEARS EXPERIENCE <br />a, TOTAL 281b' WITH CURRENT FIRM 22 <br /> <br />PhD Civil Engineering/1988/University of Miami, FL <br />MSCE/1983/University of Alabama <br />BSCE/1981/University of Alabama Professional Engineer Florida 44130 (1991) <br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training. A wards. etc,) <br /> <br />Member of American Society of Civil Engineers (ASCE) <br /> <br />Member of Board of Directors, American Segmental Bridge Institute (ASBI) <br />1 9. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Newport Fishing Pier PROFESSIONAL SERVICES II~ONSTRUCTION (If applicable) <br /> City of Sunny Isles Beach, FL 2010 Under Final Review by City <br />a. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Senior Structural Designer of the 602 foot long Newport Fishing Pier located in Sunny Isles Boulevard and Collins Aveue, The Structural Plans are <br /> completed and under review, Engineer Cost Estimate $4,5 M, <br /> (1) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED <br /> The North Bay Road Pedestrian & Emergency Vehicle Bridge, Extension of North Bay Road PROFESSIONAL SERVICES II~ONSTRUCTION !If applicable) <br /> from 172nd to 174th Street. City of Sunny Isles Beach, FL 2010 Under final review by City <br /> 131 BRIEF DESCRIPTION (Brief scope. size. cost, etc,) AND SPECIFIC ROLE lXJ Check if project performed with current firm <br />b. Senior Structural Designer. The bridge is under the final design phase and is composed of five (5) simple supported spans with new Florida 1-36 <br /> beams with exterior haunch beams, Engineer Cost Estimate $1.9 M, <br /> 11) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Gwen Margolis Park PROFESSIONAL SERVICES IICONSTRUCTION (If applicable) <br /> City of Sunny Isles Beach 2009 2009 <br />c. 131 BRIEF DESCRIPTION (Brief scope, size. cost. etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Seniorf Structural Designer of the foundation mounted on Augercast Piles for the Prefabricated BR Building, Cost $75,000 <br /> 11) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED <br /> NW 21 st Avenue Pedestrian Bridge over C-13 Canal PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Broward County, FL 2008-2009 Under Construction <br />d. 13) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Senior Structural Designer of this tubular truss pedestrian bridge with concrete deck and approach ramps meeting ADA requirements. This <br /> structure gives full accsess to school/ pedestrian access, <br /> 11) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Pedestrian Bridge over Dressel's Dairy Canal PROFESSIONAL SERVICES tONSTRUCTION (If applicable) <br /> Miami-Dade County, FL 2003 2004 <br /> 131 BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE l.XJ Check if project performed with current firm <br />e. Senior Structural Designer of this tubular truss pedestrian bridge with concrete deck and approach ramps meeting ADA requirements, Cost <br /> $340,000, <br /> <br />STANDARD FORM 330 (62004) PAGE 2 <br />Continuation Sheet <br />