Laserfiche WebLink
<br />12, NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Comp/ete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br /> <br />Joseph Rojas, MSCE <br />15, FIRM NAME AND LOCATION (Citv and State) <br />Beiswenger, Hoch & Associates, Inc, 510 Shotgun Road, Suite 400, Sunrise, FL 33326 <br />16, EDUCATION (DEGREE AND SPECIALlZA nON) 17, CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br /> <br />Senior Highway Engineer <br /> <br />14, YEARS EXPERIENCE <br />a, TOTAL lb. WITH CURRENT FIRM <br /> <br />241 24 <br /> <br />MS/1986/Civil Engineering, University of Miami <br />BS/1983/Civil Eningeering, University of Miami <br />BS/1983/Architectural Engineering, University of Miami <br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training. Awards, ete,) <br /> <br />, 9. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (CitV and State) (2) YEAR COMPLETED <br />State Road 816 (Oakland Park Blvd), from Powerline Road to Bayvie Drive PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Browrd County, FL, FDOT District 4 2004 - 2009 2009 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE X Check if project performed with current firm <br />a. Project Manager for the 3 mile project for FDOT District 4 from east of 1-95 to Bayview Drive. The project includes milling & resurfacing the existing <br />pavement, addressing safley concerns and bringing roadway and structure features up to current resurfacing, restoration and rehabilitation, FM <br />#41379515201 Contact: Nadir Rodriques, PE (954) 777-4385. Cost $1,164,000, <br /> <br />(1) TITLE AND LOCATION (Citv and State) (2) YEAR COMPLETED <br />MDX Project No, 11205,020 Master Plan PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Miami-Dade, FL 2006 - 2007 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost. etc,) AND SPECIFIC ROLE X Check if project performed with current firm <br /> <br />b, Project Engineer for development of the Master Plan for the SR-836/SR-112 Interconnector in Miami. This 3 mile project was undertaken by the <br />Miami-Dade Expressway Authority to interconnect SR-836 and SR-112, as well as the ramps to and from the MIC, the Miami International Airport <br />and a number of local streets, Contact: Alfred Lurigados, P,E. (305) 637-3277. Cost $1,985,443. <br /> <br />(1) TITLE AND LOCATION (Citv and State) (2) YEAR COMPLETED <br />SR-5/ US-1 Brickell Avenue Bridge Widening PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Miami-Dade, FL 2005 - 2006 2006 <br />(3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.! AND SPECIFIC ROLE X Check if project performed with current firm <br /> <br />c. Project Engineer on this fast-track project to widen the Brickell Avenue bridge by one lane in the NB direction. The project included widening of the <br />north bridge approach span and widening of the north bridge access ramp, FM #24910225201, Contact: Teresita Alvarez (305) 470-6721, <br /> <br />I IT lany (2) YEAR COMPLETED <br />Improvements PROFESSIONAL SERVICES CONSTRUCTION ((f applicable) <br />Miami-Dade County, FL 2002 - 2005 2005 <br />(3) BRIEF DESCRIPTION (Brief scope. size, cost, etc,) AND SPECIFIC ROLE X Check if project performed with current firm <br />d. Project Manager for the roadway improvements which consisted of widening and reconstruction of NW 72nd from 2 to 4 lanes with painted median, <br />curb and gutter, sidewalks, signing and pavement markings, signalization, concrete barrier walls, sound walls and the addition of a bridge spanning <br />the Miami River connecting to SR 25, thus providing NB continuity of the arterial. Drainage system was reconstructed with exfiltration trenches, <br />Cost $ <br /> <br />(1) TITLE AND LOCATION (CitV and State) <br />SR-80 / Southern Blvd, from SR-7 to Floirda's Turnpike <br />Palm Beach County, FL, FDOT 4 <br />(3) BRIEF DESCRIPTION (Brief scope. size, cosT. etc,) AND SPECIFIC ROLE <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION ((f applicable) <br /> <br />2001 - 2003 <br /> <br />e, <br />Joseph Rojas prepared the Electronic Delivery for this project, which included the widening from 4 to 8 lanes of 2,62 miles of road, a new 3-span <br />bridge along the main line and a new bridge over the C-51 Canal. Cost: On-going job starting 1993 to 2008 $28 M, <br /> <br />X Check if project performed with current firm <br /> <br />STANDARD FORM 330 (6 2004) PAGE 2 <br />Continuation Sheet <br />