<br />12, NAME
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Comp/ete one Section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />
<br />Joseph Rojas, MSCE
<br />15, FIRM NAME AND LOCATION (Citv and State)
<br />Beiswenger, Hoch & Associates, Inc, 510 Shotgun Road, Suite 400, Sunrise, FL 33326
<br />16, EDUCATION (DEGREE AND SPECIALlZA nON) 17, CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
<br />
<br />Senior Highway Engineer
<br />
<br />14, YEARS EXPERIENCE
<br />a, TOTAL lb. WITH CURRENT FIRM
<br />
<br />241 24
<br />
<br />MS/1986/Civil Engineering, University of Miami
<br />BS/1983/Civil Eningeering, University of Miami
<br />BS/1983/Architectural Engineering, University of Miami
<br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training. Awards, ete,)
<br />
<br />, 9. RELEVANT PROJECTS
<br />(1) TITLE AND LOCATION (CitV and State) (2) YEAR COMPLETED
<br />State Road 816 (Oakland Park Blvd), from Powerline Road to Bayvie Drive PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Browrd County, FL, FDOT District 4 2004 - 2009 2009
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE X Check if project performed with current firm
<br />a. Project Manager for the 3 mile project for FDOT District 4 from east of 1-95 to Bayview Drive. The project includes milling & resurfacing the existing
<br />pavement, addressing safley concerns and bringing roadway and structure features up to current resurfacing, restoration and rehabilitation, FM
<br />#41379515201 Contact: Nadir Rodriques, PE (954) 777-4385. Cost $1,164,000,
<br />
<br />(1) TITLE AND LOCATION (Citv and State) (2) YEAR COMPLETED
<br />MDX Project No, 11205,020 Master Plan PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Miami-Dade, FL 2006 - 2007
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost. etc,) AND SPECIFIC ROLE X Check if project performed with current firm
<br />
<br />b, Project Engineer for development of the Master Plan for the SR-836/SR-112 Interconnector in Miami. This 3 mile project was undertaken by the
<br />Miami-Dade Expressway Authority to interconnect SR-836 and SR-112, as well as the ramps to and from the MIC, the Miami International Airport
<br />and a number of local streets, Contact: Alfred Lurigados, P,E. (305) 637-3277. Cost $1,985,443.
<br />
<br />(1) TITLE AND LOCATION (Citv and State) (2) YEAR COMPLETED
<br />SR-5/ US-1 Brickell Avenue Bridge Widening PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Miami-Dade, FL 2005 - 2006 2006
<br />(3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.! AND SPECIFIC ROLE X Check if project performed with current firm
<br />
<br />c. Project Engineer on this fast-track project to widen the Brickell Avenue bridge by one lane in the NB direction. The project included widening of the
<br />north bridge approach span and widening of the north bridge access ramp, FM #24910225201, Contact: Teresita Alvarez (305) 470-6721,
<br />
<br />I IT lany (2) YEAR COMPLETED
<br />Improvements PROFESSIONAL SERVICES CONSTRUCTION ((f applicable)
<br />Miami-Dade County, FL 2002 - 2005 2005
<br />(3) BRIEF DESCRIPTION (Brief scope. size, cost, etc,) AND SPECIFIC ROLE X Check if project performed with current firm
<br />d. Project Manager for the roadway improvements which consisted of widening and reconstruction of NW 72nd from 2 to 4 lanes with painted median,
<br />curb and gutter, sidewalks, signing and pavement markings, signalization, concrete barrier walls, sound walls and the addition of a bridge spanning
<br />the Miami River connecting to SR 25, thus providing NB continuity of the arterial. Drainage system was reconstructed with exfiltration trenches,
<br />Cost $
<br />
<br />(1) TITLE AND LOCATION (CitV and State)
<br />SR-80 / Southern Blvd, from SR-7 to Floirda's Turnpike
<br />Palm Beach County, FL, FDOT 4
<br />(3) BRIEF DESCRIPTION (Brief scope. size, cosT. etc,) AND SPECIFIC ROLE
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION ((f applicable)
<br />
<br />2001 - 2003
<br />
<br />e,
<br />Joseph Rojas prepared the Electronic Delivery for this project, which included the widening from 4 to 8 lanes of 2,62 miles of road, a new 3-span
<br />bridge along the main line and a new bridge over the C-51 Canal. Cost: On-going job starting 1993 to 2008 $28 M,
<br />
<br />X Check if project performed with current firm
<br />
<br />STANDARD FORM 330 (6 2004) PAGE 2
<br />Continuation Sheet
<br />
|