Laserfiche WebLink
<br />12 NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13, ROLE IN THIS CONTRACT <br /> <br />Rina Mariela Cuba, P.E. <br />15, FIRM NAME AND LOCATION (City and State) <br />Beiswenger, Hoch & Associates, Inc" 510 Shotgun Road, Suite 400, Sunrise, FL 33326 <br />16, EDUCATION !DEGREE AND SPECIALlZA nON) 17, CURRENT PROFESSIONAL REGISTRA TION (STA TE AND DISCIPLINE) <br /> <br />Highway Engineer <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL Ib, WITH CURRENT FIRM <br /> <br />141 5 <br /> <br />BSCE/1992/Pontifical Catholic University, Lima, Peru <br />Civil Engineer/1994/Pontifical Catholic university, Lima, Peru Professional Engineer Florida 65564 (2006) <br />XII International Highway Course Polytechnic, University of Madrid, Spain Professional Engineer Lima, Peru 46770 (1994) <br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.) <br /> <br />19, RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED <br /> Julia Tuttle Causeway/SR-112/1-195 Milling and Resurfacing PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Miami-Dade County, FL 2006 - 2008 2008 <br />a. 13) BRIEF DESCRIPTION (Brief scope, size. cost, etc,) AND SPECIFIC ROLE lXJ Check if project performed with current firm <br />Deputy/assistant Project Manager for this 3.1 mile project which consists of milling and resurfacing, signing and pavement markings and utility <br /> coordinat (letting date: Feb. 2009), Performed all necessary coordination with the dept's project manager as well as with District 6's offices of Design <br /> Pavement Design, Utility, Right-of-Way, Drainage, Traffic Operations, Specifications, Construction and Final Design, Cost $276,742, <br /> 11) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED <br /> 1-751 SR-93 Milling and Resurfacing PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Miami-Dade County, FL FDOT 6 2006 - 2008 <br />b. 13) BRIEF DESCRIPTION (Brief scope, size. COSI, etc,) AND SPECIFIC ROLE l.XJ Check if project performed with current firm <br />Assistant Project Manager tha tincluded milling and resurfacing, signing and pavement markings and safety analysis of 5,5 miles of 1-75, Performed <br /> all necessary coordination with the dept's project manager as well as with District 6's offices of Design Pavement Design, Utility, Right-of-Way, <br /> Drainage, Traffic Operations, Specifications, Construction and Final Design, Cost $248,983, <br /> (1) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED <br /> 1-95/ SR-9 Bridge over the C-17 (Congress Avenue) Canal PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Palm Beach County, FL FDOT 4 2007 - 2008 <br />C. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Project Engineer for this .3 mile design-build project with Hubbard Construction Company - in charge of developing roadway and MOT plans related <br /> to the construction of a single span concrete bridge over the existing C-17 box culvert. Contact: James Hughes (954) 777-4419. <br /> (1) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED <br /> State Road 816 (Oakland Park Blvd), from Powerline Road to Bayvie Drive PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Browrd County, FL, FDOT District 4 2004 - 2009 2009 <br />d. 13) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE lXJ Check if project performed with current firm <br />Senior Roadway Engineer for the 3 mile project for FDOT District 4 from NW 10th Terrace to Bayview Drive, The project includes milling & <br /> resurfacing the existing pavement, addressing saftey concerns and bringing roadway and structure features up to current resurfacing, restoration <br /> and rehabilitation, FM #41379515201 Contact: Nadir Rodriques, PE (954) 777-4385, Cost $1,164,000. <br /> 11) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Blue Ridge Parkway PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> North Carolina - FHWA 2004 - 2006 <br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc,) AND SPECIFIC ROLE l.XJ Check if project performed with current firm <br />e. Project Engineer on two projects, consisting of milling and surfacing and rehabilitation of a total of 32.4 miles of the Blue Ridge Parkway, including <br /> overlooks, parking areas, development areas and access roads, The projects comprised milling, pavement patching, stone curb replacement, minor <br /> bidge repair and drainage improvements, including drainage structure evaluation and replacement. Cost $5 M, <br /> <br />STANDARD FORM 330 162004) PAGE 2 <br />Continuation Sheet <br />