|
<br />12 NAME
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13, ROLE IN THIS CONTRACT
<br />
<br />Rina Mariela Cuba, P.E.
<br />15, FIRM NAME AND LOCATION (City and State)
<br />Beiswenger, Hoch & Associates, Inc" 510 Shotgun Road, Suite 400, Sunrise, FL 33326
<br />16, EDUCATION !DEGREE AND SPECIALlZA nON) 17, CURRENT PROFESSIONAL REGISTRA TION (STA TE AND DISCIPLINE)
<br />
<br />Highway Engineer
<br />
<br />14. YEARS EXPERIENCE
<br />a. TOTAL Ib, WITH CURRENT FIRM
<br />
<br />141 5
<br />
<br />BSCE/1992/Pontifical Catholic University, Lima, Peru
<br />Civil Engineer/1994/Pontifical Catholic university, Lima, Peru Professional Engineer Florida 65564 (2006)
<br />XII International Highway Course Polytechnic, University of Madrid, Spain Professional Engineer Lima, Peru 46770 (1994)
<br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.)
<br />
<br />19, RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED
<br /> Julia Tuttle Causeway/SR-112/1-195 Milling and Resurfacing PROFESSIONAL SERVICES ICONSTRUCTION (If applicable)
<br /> Miami-Dade County, FL 2006 - 2008 2008
<br />a. 13) BRIEF DESCRIPTION (Brief scope, size. cost, etc,) AND SPECIFIC ROLE lXJ Check if project performed with current firm
<br />Deputy/assistant Project Manager for this 3.1 mile project which consists of milling and resurfacing, signing and pavement markings and utility
<br /> coordinat (letting date: Feb. 2009), Performed all necessary coordination with the dept's project manager as well as with District 6's offices of Design
<br /> Pavement Design, Utility, Right-of-Way, Drainage, Traffic Operations, Specifications, Construction and Final Design, Cost $276,742,
<br /> 11) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED
<br /> 1-751 SR-93 Milling and Resurfacing PROFESSIONAL SERVICES ICONSTRUCTION (If applicable)
<br /> Miami-Dade County, FL FDOT 6 2006 - 2008
<br />b. 13) BRIEF DESCRIPTION (Brief scope, size. COSI, etc,) AND SPECIFIC ROLE l.XJ Check if project performed with current firm
<br />Assistant Project Manager tha tincluded milling and resurfacing, signing and pavement markings and safety analysis of 5,5 miles of 1-75, Performed
<br /> all necessary coordination with the dept's project manager as well as with District 6's offices of Design Pavement Design, Utility, Right-of-Way,
<br /> Drainage, Traffic Operations, Specifications, Construction and Final Design, Cost $248,983,
<br /> (1) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED
<br /> 1-95/ SR-9 Bridge over the C-17 (Congress Avenue) Canal PROFESSIONAL SERVICES ICONSTRUCTION (If applicable)
<br /> Palm Beach County, FL FDOT 4 2007 - 2008
<br />C. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />Project Engineer for this .3 mile design-build project with Hubbard Construction Company - in charge of developing roadway and MOT plans related
<br /> to the construction of a single span concrete bridge over the existing C-17 box culvert. Contact: James Hughes (954) 777-4419.
<br /> (1) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED
<br /> State Road 816 (Oakland Park Blvd), from Powerline Road to Bayvie Drive PROFESSIONAL SERVICES ICONSTRUCTION (If applicable)
<br /> Browrd County, FL, FDOT District 4 2004 - 2009 2009
<br />d. 13) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE lXJ Check if project performed with current firm
<br />Senior Roadway Engineer for the 3 mile project for FDOT District 4 from NW 10th Terrace to Bayview Drive, The project includes milling &
<br /> resurfacing the existing pavement, addressing saftey concerns and bringing roadway and structure features up to current resurfacing, restoration
<br /> and rehabilitation, FM #41379515201 Contact: Nadir Rodriques, PE (954) 777-4385, Cost $1,164,000.
<br /> 11) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Blue Ridge Parkway PROFESSIONAL SERVICES ICONSTRUCTION (If applicable)
<br /> North Carolina - FHWA 2004 - 2006
<br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc,) AND SPECIFIC ROLE l.XJ Check if project performed with current firm
<br />e. Project Engineer on two projects, consisting of milling and surfacing and rehabilitation of a total of 32.4 miles of the Blue Ridge Parkway, including
<br /> overlooks, parking areas, development areas and access roads, The projects comprised milling, pavement patching, stone curb replacement, minor
<br /> bidge repair and drainage improvements, including drainage structure evaluation and replacement. Cost $5 M,
<br />
<br />STANDARD FORM 330 162004) PAGE 2
<br />Continuation Sheet
<br />
|