Laserfiche WebLink
<br />12, NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person,) <br />13. ROLE IN THIS CONTRACT <br /> <br />Manuel A. Vega, P.E. <br />15, FIRM NAME AND LOCATION (City and State) <br />Beiswenger, Hoch & Associates, Inc" 510 Shotgun Road, Suite 400, Sunrise, FL 33326 <br />16. EDUCATION (DEGREE AND SPECIALlZA TlON! 17 CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br /> <br />Senior Drainage Engineer <br /> <br />14, YEARS EXPERIENCE <br />a, TOTAL Ib, WITH CURRENT FIRM <br /> <br />331 5 <br /> <br />BS/1975/Civil Eningeering, National University of Nicaragua <br />MS/1977/Hydraulic Engineering, University of Nebraska PE 40695 (1988) Florida <br />MS/1983/Environmental Engineering, University of Michigan PE 32117 (1986) Michigan <br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training, Awards. etc.! <br /> <br />American Society of Highway Engineers <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> State Road 816 (Oakland Park Blvd). from Powerline Road to Bayvie Drive PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Browrd County, FL, FDOT District 4 2004 - 2009 2009 <br />a. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.! AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Lead Drainage Engineer - Performed the pavement design on this Milling and Resurfacing project for FOOT 4, The project length is 3.0 miles. FM <br /> #41379515201 Contact: Nadir Rodriques, PE (954) 777-4385, Cost $1,164,000, <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> FHWA Highway & Bridge Engineering, PRA-BLRI2D15, 2H13, J16 PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Boone & West Jefferson, NC 2003 - 2009 <br />b. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE lXJ Check if project performed with current firm <br />Senior Drainage Engineer - These two projects consist of milling and surfacing and rehabilitating 13.3 miles and 19.1 miles of the Bule Ridge <br /> Parkway, overlooks, parking areas, development areas and access roads, The project includes milling, pavement patching, stone curb <br /> replacement, minor bridge repair and drainage improvements including evaluation, Contract 1 Cost $1,5 M, Contract 2 Cost $5 M, <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Central Island Drainage and Street Improvements PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> City of Sunny Islea Beach, FL, Miami-Dade County 2005 - 2010 <br />C. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.! AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Drainage Engineer for the Value Engineering Study and Final Design for this project, which was comprised of 26 drainage wells for drainage and <br /> flood control and street rehabilitation, Contact: Rick Conner (305) 792-1928. Cost $ <br /> (1) TITLE AND LOCATION (City and SIBle) (2) YEAR COMPLETED <br /> VA -Medical Center, New Offices & Warehouse PROFESSIONAL SERVICES ICONSTRUCTION (If applicablel <br /> West Palm Beach, FL 2005 - 2007 2007 <br />d. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Drainage Engineer - BHA was the Engineer of Record for the Civil Plans of the Office-Warehouse building the VA-Medical Center, which includes <br /> paving, grading, drainage, water and sewer, The paving included the design of parking areas of previous concrete as well as rigid pavement, Cost <br /> $1,3 M, <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Sunny Isles Beach Community School PROFESSIONAL SERVICES llCONSTRUCTION (If applicable) <br /> Miami-Dade County, FL 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc,) AND SPECIFIC ROLE l.XJ Check if project performed with current firm <br />e. Engineer of Record for the Drainage Design on the new school for Sunny Isles Beach, The Drainage design consists of 8-gravity deep well to drain <br /> the 2,09 acres of school site plus 2,26 acres of surrounding streets for a total drainage area of 4.35 acres. Contact: Mr. Jorge Vera (305) 792-1912, <br /> <br />STANDARD FORM 330 (62004) PAGE 2 <br />Continuation Sheet <br />